J065--DC Ceiling Lift Replacement RFQ

SOL #: 36C24526Q0269Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
245-NETWORK CONTRACT OFFICE 5 (36C245)
LINTHICUM, MD, 21090, United States

Place of Performance

Washington, DC

NAICS

Surgical and Medical Instrument Manufacturing (339112)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Medical, Dental, And Veterinary Equipment And Supplies (J065)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 22, 2026
3
Submission Deadline
Jun 16, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically NETWORK CONTRACT OFFICE 5 (36C245), is soliciting proposals for the replacement and installation of ceiling lifts at the Washington DC VA Medical Center. This Small Business Set-Aside opportunity seeks a comprehensive solution for patient transfer systems. Proposals are due June 16, 2026, at 12 PM EST.

Scope of Work

This Request for Quotation (RFQ) requires the procurement and installation of a fleet replacement acquisition solution for ceiling lifts. Key requirements include:

  • Supply and installation of 276 standard clinical ceiling lift motors and 6 bariatric ceiling lift motors, along with all necessary hardware, accessories, and track systems (up to 18'x18').
  • Identification and resolution of conflicting infrastructure, structural deficiencies, and provision of comprehensive drawings (electrical, ICRA, HVAC, lighting).
  • Deinstallation of existing systems and phased installation of new systems to minimize patient impact.
  • One year of service and at least a 3-year warranty on lift motors and rail systems.
  • Use of OEM certified parts and service by OEM certified and trained engineers/technicians.
  • Compliance with VHA Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA) protocols.
  • Load testing using a certified weight cart and resolution of electrical malfunctions.
  • Incidental repairs such as drywall patching and ceiling tile replacement.
  • Offerors may provide up to three quotes: 1) adapting to existing tracks, 2) replacing all equipment and tracks, or 3) proposing an alternative Statement of Work.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Period of Performance: Up to one year for a fully installed and operational system.
  • Set-Aside: Small Business
  • NAICS Code: 339112 (Surgical and Medical Instrument Manufacturing)
  • Response Due: June 16, 2026, 12 PM EST
  • Published Date: May 22, 2026 (Amendment 1)
  • Original Site Visit: May 4, 2026 (completed)
  • Original Questions Deadline: May 9, 2026 (answered in Amendment 1)

Evaluation

Award will be based on a "Best Value" comparative evaluation, considering Technical/Implementation Capability, Price, and Past Performance. Missing or incomplete responses may be considered non-compliant.

Additional Notes

Amendment 1 (posted May 22, 2026) extended the RFQ close date and provided answers to pre-site visit questions, including details on adaptable rooms, charging methods, new track system requirements, slings, and training. Relevant attachments include a ceiling price list, lift inventory, and installation/maintenance checklists. The only point of contact is Stephanie Henderson (stephanie.henderson3@va.gov).

People

Points of Contact

stephanie.henderson3@va.govstephanie.henderson3@va.govPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 22, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
J065--DC Ceiling Lift Replacement RFQ | GovScope