J998 - USNS SHIP, VOYAGE REPAIR, CONTRACT CHANGE ORDER 2 FOR NEW WORK
SOL #: N6817125Q0017Justification
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVSUP FLC SIGONELLA NAPLES OFFICE
FPO, AE, 09622-0050, United States
Place of Performance
Place of performance not available
NAICS
Ship Building and Repairing (336611)
PSC
Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
May 20, 2025
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
No description available
People
Points of Contact
Nicole Barnhart 21PRIMARY
Files
Files
Versions
Version 1Viewing
Justification
Posted: May 20, 2025