Jacobson Gate Construction ECP

SOL #: W9126G26R1B9VSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W076 ENDIST FT WORTH
FORT WORTH, TX, 76102-6124, United States

Place of Performance

Goodfellow AFB, TX

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance Of Miscellaneous Buildings (Z1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 20, 2026
2
Last Updated
Feb 20, 2026
3
Response Deadline
Feb 25, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers - Fort Worth District is conducting market research through a Sources Sought notice for the Jacobson Gate Construction ECP project at Goodfellow AFB, TX. This project involves the construction of a new road and infrastructure for a Gate Entry Control Point. The estimated construction magnitude is $5,000,000 to $10,000,000, with an expected Period of Performance of 365 days. Interested parties are requested to submit capability statements by February 25, 2026, at 2 PM.

Scope of Work

The project entails the expansion and reconfiguration of both inbound and outbound lanes at the Entry Control Facility (ECF). Key components include:

  • Installation of raised traffic islands with guard booths for ID checks.
  • Construction of an overwatch station.
  • Implementation of a final denial barrier system.
  • Integration of cybersecurity measures for facility-related systems.
  • Entry Control Building construction.
  • Roadway Demolition.
  • Construction of Barriers.
  • Provision of all supervision, labor, materials, equipment, supplies, and transportation.
  • Compliance with relevant state, local, and federal regulations and codes.

Contract & Timeline

  • Opportunity Type: Sources Sought / Market Research
  • Estimated Magnitude: $5,000,000 to $10,000,000
  • Expected Period of Performance: 365 days
  • Response Due: February 25, 2026, by 2 PM (CST)
  • Published Date: February 20, 2026
  • Place of Performance: Goodfellow AFB, TX

Eligibility / Set-Aside

  • Set-Aside: Not specified in this Sources Sought notice.

Submission & Evaluation

This is NOT a solicitation; proposals are not being accepted at this stage. The government is seeking capability statements to gauge market interest and determine potential small business participation. Responses will inform future acquisition strategies.

Additional Notes

The government may use the internet as the sole means of notification for future updates. Contractors are responsible for checking official websites like SAM.gov and PIEE. A full Request for Proposal (RFP) with detailed Statement of Work and Design Plans is anticipated in a future solicitation.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Feb 20, 2026
Version 1
Sources Sought
Posted: Feb 20, 2026
View
Jacobson Gate Construction ECP | GovScope