Office Janitorial Services, Buffumville Lake and Hodges Village Dam, Charlton and Oxford, MA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) - New England District is soliciting quotes for Office Janitorial Services at Buffumville Lake (Charlton, MA) and Hodges Village Dam (Oxford, MA). This procurement is a Total Small Business Set-Aside. Quotes are due February 11, 2026.
Scope of Work
The contractor shall provide all equipment, materials, labor, and transportation necessary to perform janitorial services at three primary locations:
- Buffumville Lake Project Office: One building located in Charlton, MA.
- Hodges Village Dam Project Office: Two buildings located in Oxford, MA.
- Thames River Basin Office: One building located in Oxford, MA.
Services include routine cleaning (vacuuming, mopping, dusting, restroom and kitchen sanitation, and waste removal) and periodic "spring cleaning" tasks such as exterior window washing (up to 15 feet). Average facility occupancy ranges from 2 to 10 people.
Contract & Timeline
- Type: Request for Quotations (RFQ)
- Duration: Base year (March 1, 2026 – February 28, 2027) plus two (2) one-year option periods.
- Set-Aside: Total Small Business (NAICS 561720)
- Response Due: February 11, 2026, at 2:00 PM ET
- Published: January 30, 2026 (Updated via Amendment 0002 on February 10, 2026)
Evaluation
Award will be made to the responsible vendor offering the lowest price. Vendors must have an active registration in SAM.gov at the time of submission; failure to have an active registration will result in the quote being rejected as non-responsive.
Additional Notes
- Amendment 0002 extended the submission deadline and clarified that a cleaning person may also serve as the Site Safety and Health Officer (SSHO) if they meet Level 3 requirements.
- No on-site storage areas will be provided for contractor equipment.
- Site visits are strongly recommended to understand the facility layouts, as floor plans are not provided. Contact Park Ranger Aidan Buck for scheduling.