JBE081 F-22 Fuel Systems

SOL #: W911KB25R0003Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SN ENDIST ALASKA
ANCHORAGE, AK, 99506-0898, United States

Place of Performance

Place of performance not available

NAICS

Oil and Gas Pipeline and Related Structures Construction (237120)

PSC

Construction Of Fuel Supply Facilities (Y1NA)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 31, 2025
2
Last Updated
Aug 14, 2025
3
Submission Deadline
Aug 25, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code. Project Labor Agreement requirements have been removed from this project via amendment 0008. Proposal due date has been extended 30 days due to this change.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 13Viewing
Solicitation
Posted: Aug 14, 2025
Version 12
Solicitation
Posted: Jul 29, 2025
View
Version 11
Solicitation
Posted: Jul 25, 2025
View
Version 10
Solicitation
Posted: Jul 25, 2025
View
Version 9
Solicitation
Posted: Jun 26, 2025
View
Version 8
Solicitation
Posted: Jun 3, 2025
View
Version 7
Solicitation
Posted: May 21, 2025
View
Version 6
Solicitation
Posted: May 13, 2025
View
Version 5
Solicitation
Posted: May 9, 2025
View
Version 4
Solicitation
Posted: May 8, 2025
View
Version 3
Solicitation
Posted: Apr 29, 2025
View
Version 2
Solicitation
Posted: Apr 17, 2025
View
Version 1
Solicitation
Posted: Mar 31, 2025
View
JBE081 F-22 Fuel Systems | GovScope