Jet Fusion 3D printer, Jet Fusion 3D processing station, Jet Fusion build unit, and kit equipment
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is conducting Sources Sought market research to identify potential vendors capable of providing Jet Fusion 3D printer, processing station, build unit, and kit equipment for the Joint Manufacturing and Technology Center (JMTC) at Rock Island Arsenal (RIA), IL. This equipment is crucial for supporting the drone body build program. Responses are due March 17, 2026.
Scope of Work
This opportunity seeks specific Hewlett Packard (HP) Jet Fusion 3D equipment, including:
- (3) HP Jet Fusion 5600 3D Printers
- (3) HP Jet Fusion 5200 3D Processing Stations
- (6) HP Jet Fusion 5600 Build Units
- (3) HP Jet Fusion 5200 3D Series Natural Cooling Units & Starter Kits
- (1) HP Ready-to-Grow Service & (2) HP Installation Services
- (2) HP Install Post Processing Services
- (3) HP Jet Fusion 5200 Series 3D Automatic External Tank Starter Kits
- (1) HP Jet Fusion 3D Alignment Plate Accessory
- (1) HP Jet Fusion 3D Thermocamera Calibration Tool
- (1) Hovmand Forklift
Key requirements include:
- Documentation: Operating instructions and manuals on CD.
- Standards: Compliance with various national and industry standards (OSHA, ASTM, ASME, ANSI, NEMA, EIA, IEEE, ASCII, AWS, AGMA, NFPA, ISO).
- Design: Standard manufacturer products with minor changes only; English-US units; UID program compliance.
- IT Support & Security: Strict IT policies, AR 25-1/2 compliance, Information Assurance, and Accreditation.
- Safety: OSHA and RIA standards, lockout/tagout, controlled energy release, noise limits.
- Training: Contractor-provided operator, programming, maintenance, and methods training.
- Service: Verifiable service/repair capability with 48-hour on-site response.
Contract & Timeline
- Type: Sources Sought / Market Research
- Agency: DEPT OF DEFENSE / DEPT OF THE ARMY / W6QK ACC-RI
- Location: Joint Manufacturing and Technology Center (JMTC), Rock Island Arsenal (RIA), IL 61299, United States.
- Set-Aside: None specified (market research stage). Suggested source is Hewlett Packard (HP) or similar.
- Response Due: March 17, 2026, 3:00 PM Z
- Published: March 10, 2026, 6:51 PM Z
Submission & Evaluation
Interested vendors must submit a capability statement detailing their business size (Large, Small, WOSB, etc.), whether they are the manufacturer, and if not, the manufacturer's business size and country of origin. Bidders are responsible for reporting ambiguities, conducting site inspections, and ensuring compliance with delivery and installation procedures. Final acceptance is contingent upon successful setup, performance testing, training, and documentation.
Additional Notes
The opportunity emphasizes extensive requirements for safety, security, IT, and installation, including specific procedures for accessing the Rock Island Arsenal facility. Contractors must comply with all RIA security requirements, including Force Protection Levels (FPCON) and Real ID for entry starting May 3, 2025.