JLG Reburbish
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The 190th Maintenance Squadron at the 190th ARW Forbes Field ANGB has a requirement for a JLG Refurbish to include the following: Replacement of all hoses, fluids, filters, batteries, sensors, hydraulic cylinders, diagnose and inspect all electrical system and components, thorough inspection of all drive motors and axles, thorough inspection of all swing gear and basket. Pick-Up and Delivery will be coordinated by contractor along with Installation will occur at the Contractor?s Facility. Installation shall be completed no later than 120 Days after date of contract award.**Funding is not currently available for this acquisition. No contract award will be made until appropriated funds are made available. FAR 52.232-18, Availability of Funds (APR 1984) applies to this acquisition.**