JMTC COOLING PROJECT

SOL #: W519TC26QA117Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

Place of performance not available

NAICS

Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing (333415)

PSC

Refrigeration And Air Conditioning Components (4130)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 7, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
May 1, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, ACC-RI, has issued a Solicitation for the JMTC Cooling Project at Rock Island Arsenal (RIA). This project involves the provision and installation of new chiller and cooling tower systems for Buildings 212 and 222. The acquisition is Unrestricted (Full and Open), with a 10% price preference for HUBZone Small Business Concerns. Proposals are due May 1, 2026, at 10:00 AM CT.

Scope of Work

The contractor will be responsible for all materials and labor to replace and install cooling systems, including:

  • CLIN 001: Cooling Tower B212 (Comfort): Replacement of an existing cooling tower with specific performance requirements (e.g., 35,000 CFM airflow, 396 GPM flow, 1,980,000 BTU/hr heat load), constructed from 304 Stainless Steel with VFDs and cottonwood filter screens.
  • CLIN 002: Plating Shop Cooling Tower: Replacement of a 2-cell cooling tower with stringent specifications for Stainless Steel construction, VFDs, cottonwood filter screens, and freeze prevention heaters (min. 7,450,000 Btu/Hr heat load, 1500 gpm flow, 200,000 cfm airflow).
  • CLIN 003: B222 Closed-Loop Chiller Components: Replacement of the exterior chiller and heat exchanger loop for Building 222's closed-loop system, utilizing a Glycol loop and external chiller/refrigerant loop.
  • CLIN 004: Building Exhaust Fans: Replacement of existing exhaust fans in Building 212 (weld shop/foundry) with serviceable units accessible from the roof, similar to COOK ACRU-B models.

Contract Details

  • Type: Firm Fixed Price (FFP)
  • Set-Aside: Unrestricted (Full and Open)
  • NAICS Code: 333415 (Refrigeration And Air Conditioning Components)
  • Funding: Currently "short of award," with funding anticipated at a later date.
  • Warranty: A minimum one-year parts and labor warranty is required for all CLINs, starting upon final acceptance.
  • Deliverables (CDRL): Includes Installation/Preparation Documentation, Maintenance Manual, Operator Manual, and Environmental Compliance Data (SDS, Chemical List), with specific submission timelines (60 or 30 days prior to delivery).

Submission & Evaluation

  • Proposal Due: May 1, 2026, at 10:00 AM CT.
  • Evaluation: Lowest Price Technically Acceptable (LPTA) source selection.
  • Technical Factors: Experience, RIPD Compliance Statement, Equipment Identification, Warranty, and Mandatory Attendance at Site Visit. Only technically acceptable offers will proceed to price evaluation.
  • Site Visit: A mandatory site visit is scheduled for April 14, 2026, at 10:00 AM CT at RIA-JMTC (Gate 8 Large Parking Lot Turnstyle). Reservations are mandatory, and attendees must wear steel-toed safety shoes and safety glasses.

Additional Notes

Bidders must comply with strict Rock Island Arsenal security protocols, including background checks and required training. AI tools will be used to assist in proposal evaluation.

People

Points of Contact

Sophia MuckenfussSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 16, 2026
Version 3
Solicitation
Posted: Apr 8, 2026
View
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 7, 2026
View