JOFOC for Solutions For Enterprise-Wide Procurement (SEWP) V Extension

SOL #: NNG15SC00BJustification

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA IT PROCUREMENT OFFICE
Greenbelt, MD, 20771, United States

Place of Performance

Greenbelt, MD

NAICS

Electronic Computer Manufacturing (334111)

PSC

Information Retrieval (R612)

Set Aside

No set aside specified

Timeline

1
Posted
May 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics And Space Administration (NASA), specifically the NASA IT PROCUREMENT OFFICE, has issued a Justification for Other Than Full and Open Competition (JOFOC) to extend the existing Solutions for Enterprise-Wide Procurement (SEWP) V contracts. This extension, categorized under Information Retrieval (R612), is for a period of up to 12 months and is necessary to facilitate the finalization and award of the upcoming SEWP VI solicitation. The total IDIQ maximum value for SEWP V will not be increased.

Scope of Change

This JOFOC extends the SEWP V period of performance without increasing the overall contract ceiling. The extension periods are structured as follows:

  • Base Extension Period: May 1, 2026 – September 30, 2026 (5 months)
  • Option Period 4: October 1, 2026 – January 31, 2027 (4 months)
  • Option Period 5: February 1, 2027 – April 30, 2027 (3 months)

Contract & Timeline

  • Type: Justification for Extension of existing IDIQ contracts (SEWP V)
  • Duration: Up to 12 months (May 1, 2026 – April 30, 2027)
  • Value: Total IDIQ maximum ceiling value remains unchanged.
  • Set-Aside: None specified (as this is an extension of existing contracts).
  • Published Date (JOFOC): May 19, 2026
  • Document Posted Date: May 27, 2026
  • Place of Performance: Greenbelt, MD, United States

Additional Notes

This document does not directly impact proposal submissions for the SEWP V contracts, as it pertains to an extension of existing agreements. However, it is directly related to the ongoing SEWP VI solicitation (80TECH24R0001), which has seen significant industry interest and a complex evaluation process. Interested parties should monitor the SEWP VI solicitation for updates.

Contact Information

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: May 19, 2026
JOFOC for Solutions For Enterprise-Wide Procurement (SEWP) V Extension | GovScope