John Day UNIT 10 PACKING BOX REPLACEMENT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Portland District, under the Department of the Army, is issuing a pre-solicitation notice for the John Day UNIT 10 PACKING BOX REPLACEMENT project. This effort involves repairing an oil leak from the generator headcover of Unit 10 at John Day Dam in Rufus, Oregon. The estimated project value is between $1,000,000 and $5,000,000. The Invitation for Bids (IFB) is anticipated to be issued around June 26th, 2026.
Scope of Work
The project's primary objective is to repair an oil leak from the generator headcover of Unit 10. The scope of work includes, but is not limited to:
- Field verification and inspection to identify the source of the leak.
- Preparation of the work area.
- Performing necessary repairs, such as replacing gaskets and seals or repairing cracks.
- Post-repair testing to verify the leak has been resolved. The contractor will be responsible for furnishing all labor, supervision, engineering, materials, equipment, and tools required to complete the work.
Contract & Timeline
- Type: Presolicitation (leading to an Invitation for Bids - IFB)
- Product Service Code: Z2KA (Repair Or Alteration Of Dams)
- Set-Aside: None specified
- Estimated Price Range: $1,000,000 to $5,000,000
- Location of Work: John Day Dam, Rufus, Oregon
- Tentative IFB Issue Date: On or about June 26th, 2026
- Tentative Bid Opening Date: On or about October 2nd, 2026
- Anticipated Period of Performance: April 1, 2027, to July 30, 2027
- Published Date: May 28, 2026
Evaluation
Evaluation criteria will be detailed in the forthcoming Invitation for Bids (IFB).
Additional Notes
This is a pre-solicitation notice. Interested parties should monitor SAM.gov for the official IFB release. For inquiries, contact Joseph B. Jarvis at joseph.b.jarvis@usace.army.mil or Cory Pfenning at cory.r.pfenning@usace.army.mil.