Joint Base Lewis-McChord (JBLM) FORGE I Other Transaction Authority (OTA) Request for Prototype Proposal (RPP) W51EW7-26-R-A007
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through the Mission & Installation Contracting Command (MICC) Theater Support Center (TSC), has issued a Request for Prototype Proposal (RPP) under Other Transaction Authority (OTA) for the Joint Base Lewis-McChord (JBLM) FORGE I Facilities Modernization Program. This initiative, identified as W51EW7-26-R-A007, seeks innovative solutions to enhance JBLM's infrastructure and operational capabilities across 19 projects. Proposals are due May 22, 2026, at 2:00 PM EDT.
Program Overview
The JBLM FORGE I program aims to modernize aging facilities, improve operational efficiency, and support service members and their families at JBLM. Operating under 10 U.S.C. § 2808a, this pilot program seeks to demonstrate significant time and cost savings through innovative construction techniques and technologies. The overall effort is intended to exceed $200 million.
Scope of Work
The program encompasses 19 diverse projects, including:
- Infrastructure Upgrades: Renovation and construction of barracks, training facilities, administrative buildings, and maintenance shops.
- Sustainability Initiatives: Incorporation of sustainable practices and technologies.
- Enhanced Training Facilities: Development of advanced training environments, such as a dedicated Unmanned Aerial Systems (UAS) Training Site and Soldier Performance Readiness Centers (SPRCs) (new construction and interior renovations).
- Specialized Facilities: Construction of a SCIF-in-a-Box (SIAB) system with advanced security and acoustic performance, and upgrades to the I Corps JDOC Operational Support Facilities (security fence, building conversions, backup generators).
- Airfield & Range Improvements: Repairs to Taxiway 'H' and Range 76, replacement of HVAC systems in key buildings, and upgrades to airfield lighting.
- Critical Infrastructure: Repair of the JBLM Railhead and installation of emergency backup generators for Child Development Centers.
Contract & Acquisition Details
This procurement utilizes Other Transaction Authority (OTA), allowing for flexibility and innovation outside traditional Federal Acquisition Regulation (FAR) requirements. A single award for all 19 projects is intended, though multiple awards are possible if no single offeror can cover the entire scope. The period of performance will not exceed 60 months. Follow-on production agreements are anticipated under 10 U.S.C. § 2808a. Many aspects, including design standards and Unified Facilities Criteria (UFC), are negotiable, encouraging commercial best practices. The government intends to own the final design for right-to-repair purposes. There is no specific set-aside, but partnering with small businesses is encouraged.
Submission & Evaluation
Proposals will be evaluated based on:
- Technical Approach and Design
- Construction Capabilities
- Cost Savings Potential / Overall Costs The proposed schedule is a key evaluation factor. Questions regarding the RPP are now closed.
Key Dates & Contacts
- Prototype Proposal Due Date: May 22, 2026, at 2:00 PM EDT.
- Primary Contact: MICC TSC Division 1 at
usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil. - Secondary Contact: Charley Jackson, Jr. at
charley.g.jackson2.civ@army.milor(571) 588-9138.