Justification for Other than Full and Open Competition

SOL #: SPE60226P0468Justification

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA ENERGY
FORT BELVOIR, VA, 22060, United States

Place of Performance

Place of performance not available

NAICS

Petroleum Refineries (324110)

PSC

Liquid Propellants And Fuels, Petroleum Base (9130)

Set Aside

No set aside specified

Timeline

1
Posted
May 6, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Energy has published a Justification for Other than Full and Open Competition (J&A) for contract SPE602-26-P-0468. This J&A explains the rationale for a recent urgent award to BP Oil International Limited for Aviation Turbine Fuel (JA1), valued at approximately $49.8 million. The award was made without full and open competition due to unusual and compelling urgency.

Scope of Requirement

This justification covers an urgent spot buy of commercial aviation turbine jet fuel (JA1) with static dissipator additive (SDA). The fuel was delivered via FOB Origin pipeline to the Defense Fuel Support Point Central European Pipeline System (DFSP CEPS). The requirement was critical, and the urgency precluded the use of full and open competition.

Contract Details

  • Contracting Activity: Defense Logistics Agency (DLA) Energy
  • Awardee: BP Oil International Limited
  • Contract Value: Approximately $49,835,910.60
  • Product Service Code: 9130 (Liquid Propellants And Fuels, Petroleum Base)
  • Authority: Justified under FAR 6.103-2, citing unusual and compelling urgency that risked serious injury to the Government if delayed.
  • Period of Performance: From the date of award.
  • Delivery Point: DFSP CEPS.
  • Pricing Basis: Based on the awarded price multiplied by the amount of fuel, with a unit price effective April 4, 2026.

Set-Aside

No set-aside was applied due to the urgent nature of the requirement, which precluded full and open competition.

Additional Notes

This document provides insight into how DLA Energy addresses critical, urgent fuel requirements. It also explicitly states that future requirements for this location will utilize annual contracts awarded through full and open competition, indicating a return to competitive procurement for non-urgent needs.

People

Points of Contact

Jacee StumpfPRIMARY
Paul JohnsonSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: May 6, 2026
Justification for Other than Full and Open Competition | GovScope