Keweenaw Upper Breakwater Repairs

SOL #: W911XK25BA026Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST DETROIT
DETROIT, MI, 48226-5000, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 8, 2025
2
Last Updated
Sep 2, 2025
3
Submission Deadline
Aug 7, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

***Posting of the Bid Abstract**** Amendment 0001 is issued to update Wage Determination MI20250045. The bid suspense date remains the same on August 7, 2025 at 2:00 PM (Eastern). Reference the amendment document for full details. ****This Invitation for Bid (IFB) is being solicited as unrestricted. The United States Army Corps of Engineers (USACE) owns and maintains the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, Michigan. The breakwater is approximately 2,645 feet long and consists of timber crib and rubble mound construction. The inner 845 feet is a timber crib with concrete cap covered in armor stone. The remaining 1,800 feet of the breakwater is rock filled timber crib covered in armor stone. The breakwater was constructed as part of several projects that began in 1898 with the outer 1,800 feet finished in 1933. Rehabilitation projects have also been completed on the breakwater with the last occurring in the early 2000s. Non-native stamp sand is currently migrating through and/or over the breakwater into the Federally Authorized Channel which is increasing the frequency and costs related to keeping the channel at its authorized depth. The breakwater will be modified by increasing the height and providing filter material to prevent passage of stamp sand material through and/or over the breakwater into the channel. Improvements will be completed from STA 0+30 to STA 4+00 with optional improvements from STA 4+00 to STA 4+50. The work includes the excavation, hauling, and disposal of stamp sand within the specified confined disposal facility, the excavation and rework of existing armor stone, and supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), and incidental related work.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 4
Award Notice
Posted: Sep 2, 2025
View
Version 3Viewing
Solicitation
Posted: Aug 11, 2025
Version 2
Solicitation
Posted: Jul 24, 2025
View
Version 1
Solicitation
Posted: Jul 8, 2025
View