Keystone Tainter Gate NDE Material Testing
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
AM 0003 adds KEY NOTES FOR NON-DESTRUCTIVE TESTING. AM 0002 updates quote due date as 16 June 2025. AM 0001 adds Site Visit information. In-Depth Inspection and Testing of Keystone Dam Spillway Tainter Gates : provide all labor, equipment, materials to perform the work under this contract and must comply with EM 385-1-1 for all work that occurs on federal property. Unless noted otherwise all requests forinformation (RFIs) and submitted items (product data, reports, etc.) will be reviewed and returned to the Contractor in 14 calendar days. Conduct welding examinations in accordance with AWS D1.1. General work activities (not all inclusive) for the eighteen (18) spillway TainterGates at Keystone Dam.