Keystone Tainter Gate Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, Tulsa District (W076 ENDIST TULSA), is soliciting proposals for Keystone Tainter Gate Repairs at Keystone Dam, Sand Springs, Oklahoma. This opportunity, identified as a Solicitation, involves the repair or alteration of dam structures. Proposals are due by March 12, 2026. No set-aside has been specified for this requirement.
Scope of Work
The project entails comprehensive repairs to the Tainter Gates at Keystone Dam. Amendments to the solicitation indicate detailed specifications and requirements, including:
- Revised Section 01 14 00 WORK RESTRICTIONS.
- Inclusion of a Bathymetric Survey as Appendix A to the specifications.
- Boring Logs provided as Appendix B to the specifications.
- Additional reference drawing sheets, some provided in response to bidder inquiries.
Contract & Timeline
- Type: Solicitation
- Product Service Code: Z2KA (Repair Or Alteration Of Dams)
- Set-Aside: None specified
- Proposal Due: March 12, 2026, 7:00 PM UTC
- Published: March 10, 2026
- Amendments: Four amendments (AM0001, AM0002, AM0003, AM0004) have been issued, providing pre-proposal site visit details, extending the proposal due date, revising specifications, and adding reference drawings.
Additional Notes
Two pre-proposal site visits were conducted on February 11, 2026, and February 26, 2026, with sign-in sheets available for review. Bidders should ensure they have reviewed all amendments and associated documents, particularly those related to revised work restrictions, surveys, and drawings. Submissions are likely handled via the PIEE Solicitation Module, as indicated by related documents.