Kinney Creek Trail Bridge Replacement

SOL #: 127EAV26Q0010Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 5
Albuquerque, NM, 871023498, United States

Place of Performance

Payette, ID

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
Jan 21, 2026
3
Submission Deadline
Jan 24, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Kinney Creek Trail Bridge Replacement project in Payette, Idaho. This Total Small Business Set-Aside opportunity involves the design, purchase, delivery, and installation of a 40-foot span prefabricated steel truss trail bridge at a remote site requiring helicopter transport. Quotes are due by January 30, 2026, at 5:00 PM MT.

Scope of Work

The project entails the design, procurement, delivery, and installation of a 40-foot span prefabricated steel truss trail bridge. Key tasks include the removal and disposal of the existing charred timber bridge components, and the rearrangement of existing on-site material for rip rap to protect new concrete sills (gabions are not required per recent Q&A). The remote location necessitates contractor-furnished helicopter support for transport of materials and components, with the contractor responsible for coordinating component weights. Design must adhere to LRFD standards, with stamped drawings and calculations due 21 days prior to fabrication. Compliance with Resource Protection Measures, federal/state/local laws, FAA, and aviation safety requirements is mandatory. A Helicopter Operations Plan and equipment cleaning for noxious weed prevention are also required. Bidders must complete an Experience Questionnaire (FS Form 6300-27) and adhere to prevailing wage rates (ID20250086) and biobased product requirements.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) single award
  • Project Magnitude: $25,000 to $100,000
  • Period of Performance: 730 calendar days after Notice to Proceed (estimated 02/02/2026 to 09/30/2028)
  • Set-Aside: Total Small Business
  • NAICS Code: 237310 (Highway, Street, and Bridge construction)
  • Bonds: 100% Performance and Payment Bonds are required; a bid bond is not.
  • Place of Performance: Payette National Forest, Payette, ID

Submission & Evaluation

  • Questions Due: January 19, 2026, NLT 5:00 PM MT
  • Quotes Due: January 30, 2026, NLT 5:00 PM MT
  • Submission: Email quotes to Ma Estrellita Dasmarinas at maestrellita.dasmari nas@usda.gov.
  • Evaluation: Best value tradeoff, considering Technical Approach, Past Performance, Experience, and Price.
  • Eligibility: Offerors must have an active SAM registration.

Additional Notes

An amendment has updated the solicitation, providing Q&A and revising the "Final Bridge Plan" drawing. The latest Q&A clarifies that while rip rap is specified, it involves rearranging existing on-site material and is incidental to bridge installation.

People

Points of Contact

Ma Estrellita DasmarinasPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Jan 21, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 16, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Dec 19, 2025
Kinney Creek Trail Bridge Replacement | GovScope