Kinzua Dam Navigational Buoy
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The requirement consists of installation, realignment, removal, cleaning, and maintenance of approximately 77 navigational buoys at the Allegheny Reservoir. The buoys are can-type, 9 inches in diameter and 60 inches in length, with regulatory messages and symbols. Required services include transporting buoys, anchors, chains, and hardware, performing accurate water depth measurements, securing anchors, and performing maintenance as required throughout the boating season. Additionally, the buoys need to be cleaned and stored after the season. All work must comply with applicable environmental and safety regulations.