Labor to Assemble, Test, and Integrate Hardware for Qatar PATRIOT Spares - Sole Source to Raytheon
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Huntsville, AL has issued a sole-source solicitation to Raytheon for the labor required to assemble, test, and integrate hardware for Qatar PATRIOT Spares. This procurement is an add-on to an existing indefinite delivery requirements type contract (SPRBL1-25-D-0006) and supports Qatar's PATRIOT operations for the Program Executive Office Missiles and Space (PEO MS) Integrated Fires Mission Command (IFMC). Proposals are due by July 28, 2026.
Scope of Work
The primary scope involves providing labor costs associated with the assembly, testing, and integration of finished hardware for PATRIOT spares. This includes components detailed in the "Spares List_Qatar Spares 2.0_23Mar26.xlsx" attachment, which specifies part numbers, nomenclature, unit of measure, and quantity for various spare parts.
Contract & Timeline
- Type: Solicitation (Sole Source to Raytheon), contemplating Firm-Fixed-Pricing for this add-on item.
- Existing Contract: SPRBL1-25-D-0006
- Set-Aside: None specified (identified recipient is a Large Business).
- Response Due: July 28, 2026, by 4:00 p.m. Central Standard Time (CST).
- Published: April 29, 2026.
- Place of Performance: Qatar.
Submission & Evaluation
Offerors must indicate their intention to provide a responsive proposal in writing within five business days. Proposals must be valid for a minimum of 180 days from receipt and include comprehensive cost/price documentation. This documentation must feature a summary schedule with fully supportable cost data, working Excel formulas, and a total cost breakdown, adhering to FAR 15.408, Table 15-2 requirements for labor categories, hours, material, equipment, and subcontractor costs. Documentation for Indirect Expense Rates (FPRAs, FPRR, FPRP, etc.) is also required. Contractors utilizing the ProPricer System must submit an Excel file with specific tabs (P-Sheet, Direct Rates, Indirect Rates, etc.).
Additional Notes
Referenced attachments include "Raytheon RFP Qatar Spares 2.0 Contract (SPRRA226R0064)" and "Spares List_Qatar Spares 2.0_23Mar26". Export Controlled Items require JCP Certification. Offerors must comply with FAR 52.204-24 and DFARS 252.204-7016 regarding covered telecommunications equipment and services. The primary contact is Lauren Tatum (lauren.tatum@dla.mil).