Lafourche East and West Jetty Rock Supply
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Amendment 0001 is to replace Sections C-3 and C-4.3.2 in the SOW with the following.C-3 SUBMITTALS. Certified quality (abrasion loss, soundness, and petrographic test results) and gradation test results of surfacing material shall be submitted to the Technical Point of Contact (TPC) for approval prior to shipment.C-4.3.2 Testing. Testing of stone shall be performed at a minimum frequency of one set of tests per 50,000 tons or fraction thereof of surfacing material placed. Testing shall include gradation, Petrographic testing as indicated in the paragraph below entitled ?Jetty Stone?. Test performance shall be pursued in such a manner that the results are obtained in the minimum time frame. All test results shall be furnished to the TPC to confirm materials compliance with the specifications. Stone not meeting the specifications shall be removed from the site and replaced with stone meeting the specifications.