Land Management Integrated Resources (LMIR) National BPA

SOL #: 1284LM26Q4000Special Notice

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 2
Ogden, UT, 844012310, United States

Place of Performance

DC

NAICS

Site Preparation Contractors (238910)

PSC

Site Preparation (F021)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Action Date
May 5, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service (FS) is issuing a BPA Call Order under the existing Land Management Integrated Resources (LMIR) National BPA for Tree Planting Site Preparation and Ash Pit Rehabilitation within the Grand Valley Ranger District, Gunnison, Saguache, Delta and Mesa Counties, CO. This call order is Unrestricted and is specifically for current LMIR BPA award holders. Proposals are due May 4, 2026, at 12:00 pm MST.

Scope of Work

This call order requires comprehensive site preparation and rehabilitation services. Key tasks include:

  • Site Preparation for Tree Planting: Creating bare soil spots for hand planting seedlings in areas with heavy grass or slash mats, using mechanical means (mini-excavators, dozers).
  • Rehabilitation of Burned Slash Pile Ash Pits: Ripping, mixing ash and soil, scattering woody debris, and potentially repiling poorly burned slash to deter noxious weeds and promote vegetation.
  • Road Work: Activities such as road opening/clearing, installation/maintenance of waterbars, roadbed ripping, re-contouring, and creating mogals for erosion control and to prevent motorized use.
  • Fence Line Right-of-Way Clearing: Clearing woody debris for livestock fence repair.
  • Snow Removal: Clearing roadways to facilitate snow melt. The work specifically targets 86 acres for planting site preparation in Taylor Firewood Taylor Park and 95 acres for ash pit rehabilitation in Slumgullion Pass.

Contract & Timeline

  • Type: Single Award BPA Call Order (Firm-Fixed Price)
  • Eligibility: Restricted to the 43 approved companies currently holding an LMIR BPA.
  • Set-Aside: Unrestricted (for this call order). The overall LMIR BPA is continuously open for new applicants.
  • Period of Performance: Date of Award through June 19, 2026.
  • Proposal Due: May 4, 2026, at 12:00 pm MST.
  • Published: April 23, 2026.

Evaluation

Award will be made to the offeror representing the best value to the Government, based on Lowest Price Technically Acceptable (LPTA) criteria. Evaluation factors include:

  • Price
  • Contractor's Quality Control Plan
  • Past Performance
  • Experience in site preparation work. Offerors must provide a detailed explanation of their ability, a Quality Control Plan, and demonstrate relevant experience.

Additional Notes

This is a Special Notice for a BPA Call Order, not an open solicitation for new vendors. However, the LMIR BPA is an open continuous BPA that allows new companies to apply. Interested parties can search for solicitation number "12363N23Q4023" on SAM.gov or contact the LMIR Team at SM.FS.lmirbpa@usda.gov to submit a proposal to join the BPA. Key attachments include a detailed Statement of Work, Map Sections, Photo Examples, Road Schematic Plates, an Experience Questionnaire, and Wage Determinations for Colorado counties.

People

Points of Contact

Breanne ParkerPRIMARY
COTTON, SARAH WSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Apr 23, 2026
Land Management Integrated Resources (LMIR) National BPA | GovScope