Launcher Long Lead Material Procurement

SOL #: N0003026C1013Award Notice

Overview

Buyer

WASHINGTON NAVY YARD, DC, 20374-5127, United States

Place of Performance

Sunnyvale, CA

NAICS

Guided Missile and Space Vehicle Manufacturing (336414)

PSC

Launchers, Guided Missile (1440)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 16, 2025

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Strategic Systems Programs (SSP) has issued a contract with Northrop Grumman System Corporation, located at 401 E Hendy Ave, Sunnyvale, CA 94086, for the procurement of the Launcher Subsystem Long Lead Material (LLM) in support of the COLUMBIA/Dreadnought Common Missile Compartment (CMC) program.

People

Points of Contact

Rickeyea SingletonPRIMARY
Patrick MachulskiSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Award Notice
Posted: Dec 16, 2025
Launcher Long Lead Material Procurement | GovScope