LBNF/DUNE-US Cryostat Temporary Ventilation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Fermi Forward Discovery Group (FFDG) is soliciting proposals for a Firm-Fixed-Price Subcontract for the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE-US) Cryostat Temporary Ventilation system. This project requires an air handling unit for temporary ventilation during cryostat installation at the Sanford Underground Research Facility (SURF) in Lead, SD. Proposals are due February 9, 2026, by 9:00 AM Mountain Time.
Scope of Work
The contractor will be responsible for the procurement, fabrication, assembly, testing, packaging, delivery, and installation of an air handling unit constructed of shipping splits. This system will feed conditioned air to the cryostat and circulate air using large feedthroughs. The scope also includes providing ducting to connect the air handling equipment to cryostat input ports and electrical connection in conduit to a designated power panel. Temporary ventilation is crucial during the installation of the cryostat membrane, insulation, and detector components.
Contract & Timeline
- Type: Firm-Fixed-Price Subcontract
- Period of Performance: Expected April 1, 2026, through June 26, 2026.
- Award Date: Expected April 1, 2026.
- Set-Aside: Not specified.
- Proposal Due: February 9, 2026, by 9:00 AM Mountain Time.
- Published: January 21, 2026.
- Mandatory Pre-Proposal Conference: Held on January 15, 2026. Attendance was required for award eligibility.
- Optional On-site Tour: RSVP was required by January 6, 2026.
Evaluation & Requirements
Proposals will be evaluated based on meeting Mandatory Requirements, Technical Evaluation criteria, and ultimately "best value" considering the proposal, price, and other factors. Bidders must submit a Small Business Subcontracting Plan (PF-07) and a Fully Burdened Hourly Rate Price Sheet (J-10) for labor categories like Electrician, HVAC Technician, and Laborer. The DOE-approved Davis-Bacon Wage Determination, SD 20250016, applies, outlining prevailing wage rates for Lawrence County, SD. Hazard analysis and safety protocols are critical components of the work.
Additional Notes
Amendment 02 clarified that the contractor provides the air handler, PE stamps are not required for engineering designs, there is no specific CFM requirement, piping is not needed, and water drain troughs are already in place.