Lefferts Pond Accessibility Improvements
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is seeking quotations for Lefferts Pond Accessibility Improvements at the Green Mountain National Forest in Chittenden, VT. This project involves the installation of an accessible floating dock and kayak launch, along with associated site work. This acquisition is a Total Small Business Set-Aside. Quotations are due by June 10, 2026, at 3:00 PM ET.
Scope of Work
The project requires the contractor to furnish all labor, materials, and incidentals for the following:
- Removal of an existing concrete mat.
- Construction of an aggregate surface trail.
- Installation of bollards and a precast concrete headwall.
- Delivery and installation of an accessible floating dock, platform, kayak launch, and gangway.
- Associated earthwork, soil erosion control, clearing, grubbing, foundation fill, and riprap installation.
Work must adhere to the included project plan set, specifications, and Forest Service Supplemental Specifications (FSSS) which modify the FP-24 construction specifications. Earthwork must be completed during low water levels, and all other work within 120 days of the Notice to Proceed.
Contract & Timeline
- Opportunity Type: Request for Quotation (RFQ) - Solicitation Number 12445526Q0066
- Contract Type: Firm Fixed Price (FFP) purchase order.
- Estimated Magnitude: Between $25,000.00 and $100,000.00.
- Set-Aside: Total Small Business Set-Aside (NAICS 237990, size standard $45M).
- Period of Performance: Work to commence within 14 calendar days of Notice to Proceed (NTP) and be completed within 120 calendar days after NTP.
- Questions Due: May 29, 2026, at 1:00 PM ET.
- Quotations Due: June 10, 2026, at 3:00 PM ET.
- Offer Acceptance Period: 30 calendar days from the receipt date.
Evaluation
Award will be made to the lowest priced, responsible quoter who is responsive to the solicitation, and whose quote is determined to be fair, reasonable, and realistic.
Submission Requirements
Offerors must submit completed quotes via email to paul.boucher@usda.gov. Required documents include:
- Completed and signed Schedule of Items (Attachment 01) with all items priced.
- Signed Standard Form 1442 (blocks 14-20C completed).
- Acknowledgement of any amendments.
Additional Notes
Bidders must be actively registered in SAM.gov. Prevailing wage rates and fringe benefits for Rutland County, VT, under the Davis-Bacon Act, are applicable (Attachment 05). Costs for Alternative Payment Protection (if award exceeds $35,000) must be included in the quote.