Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing a Presolicitation Notice for Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4. This will be a 100% Small Business Set-Aside competitive acquisition, with the solicitation expected within the next 60 days.
Scope of Work
The project involves furnishing all equipment, labor, and materials for construction services to repair compromised landside, riverside, and crown levee sections. Work may include, but is not limited to:
- Earthwork operations, including bringing in fill and borrow material.
- Haul road development and clearing of debris.
- Erosion and rutting repair.
- Levee surfacing and various stone surfacing/placement.
- Installation of stone armored protection.
- Installation and rehabilitation of drainage structures and associated apertures.
- Establishment of turf.
Contract & Timeline
- Type: Firm-Fixed Price (FFP) contract, awarded via Invitation for Bid (IFB).
- Estimated Magnitude: Between $250,000 and $500,000.
- Set-Aside: 100% Small Business Set-Aside.
- Performance Period: Approximately 365 calendar days from Notice to Proceed (NTP).
- Solicitation Release: Anticipated within the next 60 days.
- Published: November 26, 2025.
Key Requirements & Submission
- Bonds: A bid bond (20% of proposed price or $3,000,000, whichever is less) will be required with the proposal. Performance and Payment Bonds (100% of awarded contract) will be required before NTP.
- Registration: Vendors must be actively registered in the System for Award Management (SAM) and the Procurement Integrated Enterprise Environment (PIEE) prior to submitting a bid.
- Submission: Electronic bid submission is required through the PIEE system. Detailed PIEE registration instructions for the "Proposal Manager" role are provided.
- Site Visit: A site visit is planned; details will be provided in the solicitation.
Additional Notes
No pre-solicitation conference is currently scheduled. Interested vendors are encouraged to register on SAM.gov and PIEE, and to register as interested vendors on SAM.gov to receive automatic notifications of changes or the solicitation release.