Lexington Harbor Breakwater Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army / USACE Detroit District is soliciting bids for the Lexington Harbor Breakwater Repair project in Lexington, MI. This project, designated as a Total Small Business Set-Aside, involves critical infrastructure repair to prevent sand infiltration and reconstruct the breakwater walkway. Multiple amendments have been issued, extending the bid due date and revising specifications. Bids are due by March 12, 2026.
Scope of Work
The project addresses the permeable rubble mound north breakwater at Lexington Harbor, which currently allows sand shoaling due to voids. The primary objective is to transform the existing permeable structure into an impermeable one by constructing a grout curtain wall. This wall will utilize chemical grout within sand-filled areas and cementitious grout above them. Upon completion of grouting operations, the existing Portland cement concrete walkway, which is approximately 5 feet wide and generally in good condition, will be reconstructed. The scope includes mobilization, demobilization, drilling and grouting operations, verification borings, topcoat void fill, handrail dismantling and reassembly, and concrete cap demolition and replacement. An option for additional drilling and grouting operations is also included.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: March 12, 2026, 6:00 PM EST
- Published Date (Last Updated): March 13, 2026
- Amendments: Amendment 0003 extended the bid due date, bid opening date, and Request for Information period, and revised a specification section. Amendment 0002 incorporated Davis-Bacon Act Wage Determination MI20260049, extended dates, revised drawings/specifications, and provided site images/attendee list. Amendment 0001 removed a FAR clause and provided organized site visit information.
Additional Information
The Bid Abstract document, posted March 13, 2026, summarizes previous offers from contractors like M-K Construction Co Inc and Dean Marine and Excavating, Inc., detailing proposed prices for various line items, options, and the government estimate. This document is crucial for potential bidders to compare their pricing against competitors and the government's estimate, informing future bidding strategies. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals for change orders under construction contracts is available via a provided USACE link.
Contact Information
- Primary: Noah Bruck (noah.r.bruck@usace.army.mil, 313-226-2657)
- Secondary: Michelle Barr (michelle.barr@usace.army.mil)