LGA Powerhouse Controls Room Upgrade & Annunciation

SOL #: W912EF26RA002Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
US ARMY ENGINEER DISTRICT WALLA WAL
WALLA WALLA, WA, 99362-1876, United States

Place of Performance

Dayton, WA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Response Deadline
May 2, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Engineer District Walla Walla is preparing to issue an unrestricted Best Value Trade-Off (BVTO) Request for Proposals (RFP) for the LGA Powerhouse Controls Room Upgrade & Annunciation project. This effort involves upgrading electrical equipment, components, and wiring for the operation, monitoring, and control systems at the Little Goose Dam Powerhouse in Pomeroy, Washington. Competition is open to both large and small businesses, with a small business subcontracting plan required for large businesses. The solicitation, W912EF26RA002, is anticipated to be posted in early May 2026.

Scope of Work

The contractor shall provide and install electrical equipment, components, and wiring to support the Little Goose Powerhouse's control systems. Key tasks include:

  • Annunciation and SER: Combining systems, configuring HMIs for control interfaces, and installing PLCs, I/O, and wiring in the control room, S-boards, and station service panels.
  • Station Service: Providing new PLC equipment for full indication and control of 4160V SS breakers and the powerhouse diesel generator, with HMIs near the diesel generator and in the control room.
  • Digital SCC: Creating a fully functional digital SCC by integrating new hardwired and/or communication points into the existing digital governor PLC/HMI.
  • S-Boards Refurbishment: Demolishing existing wiring, meters, and indicators, and replacing them with new panels, wiring, and associated equipment.
  • Control Room Modifications: Addressing the need for an elevated floor for new wiring and consoles, and replacing existing ceiling tiles, light fixtures, and HVAC diffusers.

Contract & Timeline

  • Type: Firm-Fixed Price Construction Contract (BVTO RFP)
  • Set-Aside: Unrestricted (Open to large and small businesses; large businesses require a small business subcontracting plan)
  • NAICS: 238210 Electrical Contractors and other Wiring Installation ($19,000,000 size standard)
  • Solicitation Number: W912EF26RA002
  • Anticipated Posting: Early May 2026
  • Proposal Due: Approximately 30 days after solicitation posting (exact date in RFP)
  • Anticipated Award: Late September 2026
  • Bonds: 100% performance and payment bonds required.

Key Requirements

  • Safety: Adherence to Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), including an Accident Prevention Plan, Activity Hazard Analyses, Fall Protection Plan, and a qualified Site Safety and Health Officer (SSHO) with specific experience and training.
  • Quality Control: Establishment of an effective Contractor Quality Control (CQC) System with a comprehensive CQC Plan and a qualified CQC System Manager on-site, possessing relevant experience and

People

Points of Contact

LeAnne R. WallingPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 10, 2026
LGA Powerhouse Controls Room Upgrade & Annunciation | GovScope