LINER,BEARING
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for the repair of LINER,BEARING components. This opportunity will result in a bilateral, Firm-Fixed Price contract with an option for increased quantity. The requirement is a rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). Quotes are due by April 2, 2026.
Scope of Work
This contract covers the repair and quality assurance requirements for LINER,BEARING components, specifically referencing CAGE code 0BR59 and reference number 787E299-013. All repair work must adhere to the contractor's standard practices, manuals, and technical documentation. Key requirements include:
- Verification: Prior to responding, contractors must verify nomenclature, part number, and National Stock Number (NSN).
- Marking: Items must be physically identified in accordance with MIL-STD-130.
- Design Changes: Strict procedures for design, material, or part number changes, requiring Procurement Contracting Officer (PCO) approval for most substitutions.
- Mercury-Free: Materials supplied for use on submarines/surface ships must be free from metallic mercury contamination. Specific testing and PCO approval are required if mercury is a functional part of the material.
- Government Source Inspection (GSI): Required for this effort.
Contract & Timeline
- Contract Type: Firm-Fixed Price, bilateral award.
- Option: The Government intends to include an option for increased quantity.
- Priority Rating: This is a rated order for national defense use (DPAS), encouraging accelerated delivery.
- Freight: FOB Origin.
- Response Due: April 2, 2026, 8:30 PM UTC.
- Published: March 3, 2026.
Quote Requirements
Quotes must include:
- Unit Price and Total Price.
- Repair Turnaround Time (RTAT) in days, measured from asset return to government acceptance.
- Awardee Information: CAGE code, and if different, Inspection & Acceptance CAGE and Facility/Subcontractor CAGE.
Quality Assurance & Packaging
The contractor is responsible for all inspection and testing requirements as per original manufacturer specifications. Records of inspection must be maintained for 365 days post-delivery. Preservation, packaging, packing, and marking shall comply with MIL-STD 2073.
Additional Notes
Ordering information for various Department of Defense specifications and standards (e.g., MIL-STD-130, DODSSP, NAVSEA documents) is provided for contractor reference.