LINK ANTENNA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT has issued a Solicitation for a spares requirement for LINK ANTENNA (NIIN LLF02N689). This opportunity outlines stringent quality control, inspection, and repair assessment requirements. Responses are due May 4, 2026.
Scope of Work
This Request for Quotation (RFQ) is for a spares requirement for NIIN LLF02N689 (LINK ANTENNA). Key requirements include:
- Markings: In accordance with MIL-STD-130.
- Quality Control System: Must meet Mil-I-45208A, Mil-Q-9858, ISO-9000/9001/9002, or equivalent.
- Inspection: Contractor is responsible for all inspection requirements, including maintaining Quality Control Documentation, test/repair procedures, and inspection procedures for Government review.
- Quality Assurance Program Plan: Develop, implement, and maintain a Repair Quality Plan compliant with specified standards.
- Material Control: Establish systems for purchased material control, receiving inspection, failure analysis, and nonconforming material.
- Review Boards: Contractor Internal Review Board (IRB) authority delegated for minor non-conformances, scrap, or rework. Formal Material Review Board (MRB) authority for "AS-IS" disposition is retained by the Government.
- Repair Assessment Testing: Government may select samples for performance, environmental, and quality conformance testing.
- Data Collection: Maintain historical record files for individual CLINs and assemblies, including receipt inspection, repair travelers, parts replacement, inspection data, and acceptance test data.
- Packaging: MIL-STD 2073 applies.
Contract & Timeline
- Type: Solicitation (RFQ)
- Set-Aside: None specified
- Response Due: May 4, 2026, 8:30 PM EDT
- Published: April 3, 2026
Evaluation
Award will be based on compliance with the detailed quality assurance, inspection, and material control requirements outlined in the Statement of Work, ensuring all items meet specified standards.
Additional Notes
All contractual documents are considered "issued" when deposited in mail, transmitted by facsimile, or sent by electronic commerce methods. Contact: DEVON.M.MCNAMEE.CIV@US.NAVY.MIL or 215-697-2782.