LMR Analysis

SOL #: LMR_AnalysisCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3016 502 CONS CL
JBSA LACKLAND, TX, 78236-5286, United States

Place of Performance

San Antonio, TX

NAICS

Electronic and Precision Equipment Repair and Maintenance (811210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 9, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
May 13, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 502 CONS CL at Lackland AFB, is soliciting quotes for a Land Mobile Radio (LMR) Analysis for Joint Base San Antonio (JBSA). This opportunity, designated as a Total Small Business Set-Aside, requires a comprehensive coverage data study, including surveying specific grid areas and testing the range and reliability of existing UHF R1 ASTRO Site Repeaters. The primary goal is to identify communication gaps and enhance service reliability. Quotes are due by May 13, 2026, 3:00 PM CST.

Scope of Work

The contractor will provide a detailed LMR coverage data study for JBSA. This involves a technical team surveying 4400.5x.5 mile grids within the San Antonio area and 5-mile military influence zones. Testing will encompass both inbound and outbound signals to assess the range and reliability of the six UHF R1 ASTRO Site Repeaters currently on base. The analysis aims to address communication gaps, improve service reliability, and support user needs by enabling data-driven decision-making and risk mitigation. The government will provide office space for field team coordination and some APX 4000s radios for testing purposes.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation, Request for Quote (RFQ) for a single Firm Fixed Price delivery order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 811210 (Electronic and Precision Equipment Repair and Maintenance), with a size standard of $34,000,000.00.
  • Product Service Code: J059 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components).
  • Response Due: May 13, 2026, 3:00 PM CST.
  • Place of Performance: San Antonio, TX.
  • Delivery: Performance must be completed within 60 Calendar Days from the Date of Award Receipt.

Submission & Evaluation

Offerors must submit quotes via email by the specified due date. Submissions must include a signed copy of the solicitation, detailed pricing for the LMR Coverage Analysis Test, and confirmation of the ability to meet the required period of performance. Quotes must be responsive to be considered, and offerors must agree to hold prices firm for 60 calendar days. Award will be made to the responsible and responsive offeror providing the lowest fair and reasonable price. Funds are not currently available, and any award is contingent upon fund availability. Offerors must be registered in the System for Award Management (SAM).

Amendments & Clarifications

  • Amendment 0001 (April 17, 2026): Clarified documentation requirements for responsive offers.
  • Amendment 0002 (April 30, 2026): Extended the response due date to May 13, 2026, added an attachment with answers to contractor questions, incorporated FAR 52.222-90, and added delivery information for CLIN 0001.
  • Q&A (April 30, 2026): Confirmed government provision of office space for coordination and some APX 4000s radios, which bidders should factor into their proposals.

People

Points of Contact

Thomas FarrellPRIMARY
Autumn Perez DiazSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View