LOCAL CONTROL UNIT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy is seeking proposals for the repair of LOCAL CONTROL UNITS under a Presolicitation notice. This requirement is issued pursuant to Emergency Acquisition Flexibilities (EAF). The effort involves teardown, evaluation, and repair of these units, with a requested Repair Turn Around Time (RTAT) of 267 days. Quotes are due by April 7, 2026.
Scope of Work
This requirement covers the repair and quality assurance for LOCAL CONTROL UNITS, specifically those represented by Cage Code/Reference Number 96169 A0103090AFCTVD2, including PN/NIINs A0-103090A and A0103090AFC1TVD. Repair work must adhere to the contractor's standard practices, technical orders, and drawings. Key aspects include:
- Teardown and evaluation (TD&E) within 90 days of carcass receipt.
- Submission of a Firm-Fixed Price (FFP) quote for the full repair effort after TD&E.
- Inclusion of all costs for material receipt and complete repair, even for unwhole or damaged units.
- Compliance with MIL-STD-129 for marking and MIL-STD 2073 for packaging.
Contract & Timeline
- Type: Presolicitation (leading to a bilateral award)
- Set-Aside: None specified
- Quote Due: April 7, 2026, 8:30 PM EST
- Published: January 23, 2026
Key Requirements & Instructions
Offerors must provide an estimated repair price for the full effort and include the cost of new units for evaluation. If not the Original Equipment Manufacturer (OEM), a signed letter of authorization as a distributor and OEM details (Company Name, CAGE) are required. Quotes must specify any exceptions to solicitation requirements.
- Required Quote Information: Teardown & Evaluation Rate, Repair Turn Around Time (RTAT), Throughput Constraint, and Induction Expiration Date.
- RTAT: Requested at 267 days. Failure to meet RTAT will incur price reductions.
- Mercury-Free: All materials must be mercury-free for use on submarines/surface ships. Strict procedures apply if mercury is functionally required.
- DPAS: Any resulting contract will be DO certified for national defense under the Defense Priorities and Allocations System.
Contact Information
For inquiries, contact ABIGAIL.R.HURLBUT.CIV@US.NAVY.MIL.