Logistics Support Area - DCNG
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The DCNG is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support a potential requirement for Logistics Support Services at Logistics Support Area (LSA) Lincoln.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform services as defined in the attached draft Performance Work Statement (PWS).
The primary required services include, but are not limited to:
-
Facilities Management and Maintenance
-
Power Generation and Electrical Services
-
Water and Wastewater System Operations
-
Comprehensive Waste Management Services
The anticipated Period of Perfomrance is from 1 March 2026 to 7 July 2026.
The Government will use the information gathered from this notice to determine the best acquisition strategy for this procurement. All responsible sources may submit a capability statement, which shall be considered by the agency. The full draft PWS is attached to this notice for detailed review.