London Locks and Dam Pier House Roof Replacements
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army (W072 ENDIST HUNTINGTON) has issued a Solicitation for London Locks and Dam Pier House Roof Replacements. This project involves completely removing and replacing roof systems on five pier house structures and the Operations Building at the London Locks and Dam facility. Proposals are due April 28, 2026.
Scope of Work
The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove and replace the roof systems on five (5) pier house structures and the Operations Building. This project requires the installation of new plywood sheathing, 30 lb felt underlayment, and a new asphalt shingle system to restore watertight integrity, ensure long-term structural reliability, extend the service life of the facilities, and reduce future maintenance needs.
- Base Requirement: Operations Building and Pier House 1 roofs.
- Option 1 Requirement: Remaining four (4) pier houses.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AZ - Repair Or Alteration Of Other Administrative Facilities And Service Buildings
- Proposal Due: April 28, 2026, 4:00 PM ET
- Published: April 24, 2026
Additional Information
For inquiries, contact Katrina Lazare at katrina.d.lazare@usace.army.mil or 304-399-5183.