Lone Mt. Material Site Development & Stockpile, Coronado NF

SOL #: 127EAX26Q0021Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Tucson, AZ

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 30, 2026
2
Submission Deadline
Jun 1, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations (RFQ 127EAX26Q0021) for the Lone Mountain Material Site Development & Stockpile project within the Coronado National Forest, Arizona. This Total Small Business Set-Aside opportunity involves developing a quarry for road surfacing aggregate production, including rock blasting, excavating, crushing, and stockpiling. Offers are due by June 1, 2026.

Opportunity Details

  • Purpose: Develop the Lone Mountain Quarry on previously undisturbed land within the Sierra Vista Ranger District of the Coronado National Forest. The primary goal is to produce "G" grading surface course aggregate for road surfacing.
  • Scope of Work: The contractor will be responsible for all aspects of quarry development, including rock blasting, excavating, crushing, and stockpiling of aggregate. Work must comply with Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects (FP-14) and Forest Service Supplemental Specifications (FSSS). The contractor must obtain all necessary permits from the Arizona Department of Environmental Quality.
  • Key Deliverables: Production of 11,000 CY of "G" grading aggregate (Base Bid), with potential additive bids for additional quantities. Required deliverables include a Project Schedule, Blasting operation plan, Crushing and stockpiling plan, Spill Plan, Quality control qualifications and plan, and an Erosion control plan or SWPPP.
  • Place of Performance: Lone Mountain Quarry, Sierra Vista Ranger District, Coronado National Forest, near Tucson, AZ. No water or utilities are available within the quarry boundary.

Contract & Timeline

  • Contract Type: Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (NAICS 237310, $45M size standard).
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (NTP), with the entire work ready for use no later than 60 calendar days after NTP, including final cleanup.
  • Response Due Date: June 1, 2026.
  • Requests for Information (RFIs) Due: May 19, 2026, at 2:00 PM Pacific Time.
  • Published Date: April 30, 2026.

Evaluation Criteria

Award will be made to the offeror representing the best value to the Government, based on:

  • Technical Approach: Ability to meet schedule requirements and thorough understanding of requirements.
  • Price: Must be fair and reasonable.
  • Past Performance: Must be acceptable or neutral. Award will be made to the highest technically rated offeror, provided price is fair and reasonable and past performance is acceptable or neutral. Tradeoffs will not be conducted. Offerors must hold prices for 60 calendar days from the offer due date.

Special Requirements & Notes

  • No Site Visit: There will be no organized site visit.
  • Fire Plan Guidelines: Contractors must adhere to specific fire precaution guidelines for operations on the Coronado National Forest, including requirements for equipment, personnel (fireguards), and operational limitations during high fire danger periods.
  • Prevailing Wages: Bidders must comply with prevailing wage rates for Cochise County, Arizona, as outlined in General Decision No. AZ20260055.
  • Attachments: The solicitation includes a Statement of Work (SOW), Schedule of Items (SOI), site map, aggregate material specifications (Table 703-3), Forest Service Supplemental Specifications (FSSS), Fire Plan Guidelines, and prevailing wage rates.

People

Points of Contact

Richard OrtegaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Lone Mt. Material Site Development & Stockpile, Coronado NF | GovScope