Z--Lowell National Historical Park - REPLACE COOLING

SOL #: 140P4326R0020Solicitation

Overview

Buyer

Interior
National Park Service
NER SERVICES MABO (43000)
BOSTON, MA, 02108, United States

Place of Performance

Lowell, MA

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Museums And Exhibition Buildings (Z2JA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
Jun 10, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (Department of the Interior) has issued a Solicitation for the replacement of Cooling Tower #1 and associated pumps and valves at the Boott Cotton Mill #6, Lowell National Historical Park, MA. This is a Total Small Business Set-Aside with an estimated magnitude between $250,000 and $500,000. Proposals are due June 10, 2026, by 12:00 PM ET.

Scope of Work

The project involves comprehensive construction services including:

  • Cooling Tower Replacement: Removal of the existing rooftop cooling tower and installation of a new low-rise cooling tower on vibration rails, including piping connections and valve replacement.
  • Pump Replacement: Replacement of one 384 gpm condenser pump and two 500 gpm circulator pumps connected to Chiller #1, with the addition of variable frequency drives.
  • Valve and Piping Replacement: Replacement of approximately 24 ball valves, flexible joints, 1 automatic control valve, 4 butterfly valves, and about 16 linear feet of pipe and connections.
  • Electrical Work: Installation of new conduit and wiring for new motors.
  • System Integration: Programming new equipment to the Trane Building Management System.
  • Optional Work: Replacement of one circulatory pump in an adjacent building's basement mechanical room, including a variable frequency drive, additional valves, piping, and system integration.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Estimated Magnitude: $250,000.00 - $500,000.00
  • Period of Performance: October 15, 2026, to September 30, 2027 (350 calendar days after Notice to Proceed).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Proposal Due: June 10, 2026, by 12:00 PM ET (extended by Amendment 0001).
  • Published Date: May 7, 2026.

Submission & Evaluation

Proposals must be submitted via email to Samuel_McKenzie@ios.doi.gov. Evaluation will utilize a Best Value Continuum Tradeoff Process, considering factors such as Technical Approach, Project Experience, Training, and Price.

Additional Notes

A site visit was conducted on May 6, 2026, and sign-in sheets have been posted. Bidders should review the Davis-Bacon Wage Determination (MA20260001) for prevailing wage rates and the Construction Contract Administration Provision for details on equitable adjustments for change orders.

People

Points of Contact

McKenzie, SamuelPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: May 27, 2026
View
Version 2Viewing
Solicitation
Posted: May 7, 2026
Version 1
Solicitation
Posted: Apr 28, 2026
View