Lower Monumental Governor Oil Pump Unloader Valve Kits

SOL #: W912EF26PA013Award NoticeSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
US ARMY ENGINEER DISTRICT WALLA WAL
WALLA WALLA, WA, 99362-1876, United States

Place of Performance

Kahlotus, WA

NAICS

Industrial Valve Manufacturing (332911)

PSC

Valves, Powered (4810)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 16, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, US Army Engineer District Walla Wal, has issued an Award Notice for the sole source procurement of Lower Monumental Governor Oil Pump Unloader Valve Kits. This action is intended to update Governor Oil Pump Unloader Valve Assemblies on Main Units 1-3 of the Lower Monumental Lock and Dam's Powerhouse Generators. The award is justified to Emerson Process Management Power & Water Solutions, Inc. due to the proprietary nature of their equipment and the critical need for compatibility with existing systems. A Notice of Intent (NOI) to Sole Source will be posted on SAM.gov to allow interested vendors to respond.

Scope of Work

The requirement is for the replacement of outdated Governor Oil Pump Unloader valve assemblies with retrofit kits. These kits must incorporate time-delay electronic relays compatible with existing Pelton governor oil pumps and the US Army Corps of Engineers' (USACE) American Governor Company (AGC) digital control system. Specific deliverables include:

  • Dual Unloader Assembly Kits (compatible with Pelton C310 Main Pumps) - First Unit (1) and Follow-on Units (2).
  • Single Unloader Assembly Kits (compatible with Pelton C90 Jockey Pumps) - First Unit (1) and Follow-on Units (2).
  • Unloader Spare Parts Kit (1).

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) supply contract.
  • Delivery: All items must be delivered within 20 weeks of contract award.
  • Set-Aside: Not applicable, as this is a sole source justification.
  • Notice Date: April 16, 2026.

Justification & Market Research

Emerson is identified as the only company capable of providing compatible retrofit kits because they purchased the patents from AGC and Pelton. The existing unloader valves are 55 years old and require frequent maintenance. The government conducted market research and found no alternatives that meet requirements without significant redesign and cost. The new digital unloaders are expected to increase capability and efficiency, extending the useful service life of the governor oil pressure pumps by approximately 20%.

Additional Notes

This document serves as a justification for the sole source procurement. A formal Notice of Intent to Sole Source will be posted, allowing other vendors to demonstrate their capability to meet the requirements. The previous contract for similar services (W912EF-17-P-0066) was awarded competitively but is now considered a sole source requirement due to Emerson's proprietary software.

Contact Information

Primary Point of Contact: Callie Rietfors, callie.rietfors@usace.army.mil, 509-527-7280.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Award Notice
Posted: Apr 16, 2026
Lower Monumental Governor Oil Pump Unloader Valve Kits | GovScope