LRS Raymond Forklift Truck

SOL #: FA462026QA259Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4620 92 CONS LGC
FAIRCHILD AFB, WA, 99011-5320, United States

Place of Performance

Fairchild AFB, WA

NAICS

Industrial Truck (333924)

PSC

Warehouse Truck And Tractors, Self Propelled (3930)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
May 21, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 92 CONS LGC office, is soliciting proposals for one new Raymond 9600-CSR30T Swing Lift forklift truck for Fairchild AFB, WA. This is a Total Small Business Set-Aside combined synopsis/solicitation. An amendment has extended the proposal due date to May 21, 2026.

Scope of Work

The requirement is for one new Raymond MEEP 9600-CSR30T Swing Lift forklift. The contractor shall provide all labor, tools, parts, transportation, and supervision necessary for delivery, including shipping costs to Fairchild AFB, WA. Delivery is required no later than 30 days After Contract Award (ADC).

Salient Characteristics for the forklift are detailed in Attachment 1, specifying minimum requirements such as:

  • Rated capacity: 3000-lbs to 240", 2900-lbs to 250", 2200-lbs to 274".
  • Base legs: 40" wide; Forks: 42" long.
  • Safety features: Travel alarm, guide roller with auto center steering, safety amber strobe light, lift limit switch, speed reduction, fire extinguisher, full body harness, side-gate power cut-off switches.
  • Lighting: Forward & reverse lights; aisle & work area LED.
  • Operator amenities: Compartment fan, dome light.
  • UL "E" Safety rating, Weight & Height limit display.
  • Required add-ons: One new M250-1212515-BRAY battery (875-Ah, 24-volt) and one X7MV48-480-0207-BRAY AC power unit (480-V, 3-Ph).
  • Additional services: Delivery, set-up, prep, testing, and a 90-day follow-up visit.

Attachment 2 outlines Air Force Specific Terms and Conditions, including ombudsman information, the prohibition of Class I Ozone Depleting Substances (ODS), and comprehensive instructions for contractor access to Fairchild AFB, covering identification procedures (DBIDS Cards), vehicle access, and restrictions for personnel.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product/Service Code: 3930 (Warehouse Truck And Tractors, Self Propelled)
  • Place of Performance: Fairchild AFB, WA
  • Response Due: May 21, 2026, at 10:00 AM PT (extended by Amendment 0001)
  • Published: May 13, 2026

Submission & Evaluation

Quotes must be submitted via email to 2Lt Chantal Henry (chantal.henry.1@us.af.mil) and Ms. Samantha Gorman (samantha.gorman@us.af.mil). Evaluation factors include Price and Supplier Performance Risk System (SPRS). The government intends to award a contract to the responsible offeror whose offer is most advantageous, reserving the right to award to other than the lowest priced quote. Offerors must be registered in SAM.gov and acknowledge Amendment 0001.

Additional Notes

Questions pertaining to this RFQ were due by May 11, 2026. FAR Provisions 52.212-1 and 52.212-2 (Commercial Products and Commercial Services) apply, with addenda provided.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 18, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 6, 2026
View