LTUY202005 Construct Vehicle Operations Covered Parking
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through the W7NJ USPFO ACTIVITY MOANG 131, is soliciting quotations for the construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO. This opportunity is a Total Small Business Set-Aside with an estimated value between $500,000 and $1,000,000. Quotations are due by July 21, 2026, at 10:00 AM.
Scope of Work
This project involves the construction of two covered parking structures designed for the 131st Logistics Readiness Squadron's vehicle fleet. Key requirements include:
- Construction of two covered parking structures with rooftop solar panels.
- Installation of 24 bollards (two per column on entrance sides of each structure).
- Revision No. 01 to the contract documents specifies the removal of decorative steel brackets from all columns on both parking structures.
- Project specifications and drawings are dated July 2, 2024, with architectural drawing Sheet A600 replaced by a revised version.
- Options include Alternate 2 (Waterproof Receptacles) and Alternate 4 (Gutters and Downspouts).
- The design for the solar panel system is based on specific brand-name products (First Solar FS-6450A PV Module, CPS SCA 25KTL-DO/US-208 inverter, and Lithonia FEX-L48 products).
Contract Details
- Contract Type: Firm Fixed Price (FFP).
- Estimated Price Range: $500,000 to $1,000,000.
- Period of Performance: Preferred schedule is 260 calendar days after Notice to Proceed (NTP), which is negotiable.
- Bonds: Performance and Payment Bonds are required within 10 calendar days after award.
- Wage Rates: Construction Wage Rate Requirements (Davis-Bacon Act) are applicable, with prevailing wage rates provided for St. Louis and Washington Counties, MO.
Set-Aside
This acquisition is 100% set-aside for small business concerns.
Evaluation Criteria
Award will be based on a best value determination considering technical risk and price, without priced tradeoffs. Technical risk evaluation will focus on experience, technical qualifications, and past performance.
Key Dates & Submission
- Site Visit Registration Deadline: June 30, 2026, 5:00 PM.
- Pre-Quotation Conference and Site Visit: July 8, 2026, 1:00 PM.
- Request for Information (RFI) Deadline: 5 business days after the site visit.
- Quotation Submission Deadline: July 21, 2026, 10:00 AM.
- Submission Method: Quotations must be submitted via email to MSgt Joe Bernier at joseph.bernier.1@us.af.mil.
Additional Notes
Funds are not presently available but are anticipated to become available prior to award. Bidders must check SAM.gov periodically for any amendments.