LUCERNE CAMPGROUND CONSTRUCTION PHASE 5

SOL #: 1240LT26Q0026Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

UT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 20, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 1, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is seeking quotes for Phase 5 reconstruction of the Lucerne Campground in Flaming Gorge National Recreation Area, Utah. This is a Total Small Business Set-Aside for a Firm Fixed Price contract. The project involves demolition, new construction of restrooms and shelters, and extensive irrigation and landscaping work. Quotes are due by May 1, 2026, at 6:00 PM UTC.

Scope of Work

This project focuses on reconstructing portions of the Lucerne Campground. Base Work includes:

  • Demolition of two existing restroom buildings and adjacent concrete sidewalks.
  • Installation of new precast concrete restroom buildings (with showers) in Loops E and F, including associated electrical, water, and sewer connections.
  • Construction of new family unit shelters in Loops E and F.
  • Installation of a portion of the irrigation water main line and electrical control wiring for specific zones.
  • Asphalt trench repair.

Optional Work includes:

  • Construction of windscreens for family units.
  • Installation of roadside strips planting and irrigation systems.
  • Installation of planting and irrigation systems for Loops E & F.
  • Construction of additional irrigation mainline segments.
  • Installation of a Tree Line Bubblers Irrigation System.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ) for a Single Firm Fixed Price Contract.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 236220 (Small Business Size Standard: $45 Million).
  • Period of Performance: May 11, 2026, to November 30, 2026.
  • Contract Time: Base work: 180 Calendar Days; Each awarded option: 30 Calendar Days.
  • Place of Performance: Flaming Gorge National Recreation Area, Ashley National Forest, Daggett County, Utah.

Submission & Evaluation

Quotes will be evaluated based on lowest price, technically acceptable, with past performance also considered.

  • Technical Acceptability: Assessed via the Experience Questionnaire (Attachment 4), focusing on experience with building demolition, shelter construction, sidewalk installation, irrigation systems, and asphalt trench repair.
  • Past Performance: Rated as Acceptable, Neutral, or Unacceptable.
  • Required Submission Items (from Quote Checklist):
    • Attachment 3: Statement of Items (SOI) with all items priced.
    • Attachment 4: Completed Experience Questionnaire.
    • Acknowledgement of all amendments.
    • Fully executed Bid Guarantee (Standard Form 24 and Power of Attorney).
  • Quotes must remain firm for 60 calendar days.

Key Dates & Contacts

  • Quotes Due: May 1, 2026, at 6:00 PM UTC.
  • Site Visit: April 1, 2026, at 1:30 PM MT.
  • Questions Due: April 2, 2026, at 12:00 PM MT.
  • Primary Contact: Tony Taylor, Contract Specialist, tony.taylor@usda.gov.

Special Requirements & Notes

  • Construction areas will be closed to the public, but access to other campground loops must remain open.
  • Contractor must protect streams and lakes, pressure wash equipment to prevent noxious weeds, and implement dust abatement measures.
  • Non-potable water is available on-site for construction.
  • A traffic control plan is required.
  • The Davis-Bacon Act applies, requiring adherence to prevailing wage rates and fringe benefits for Daggett County, UT, including Executive Order requirements for paid sick leave and minimum wage.
  • Bidders must investigate site conditions.

People

Points of Contact

Tony Taylor Contract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View