LXEZ221048 Repair Restrooms Contracting Office B95

SOL #: FA527025R0007Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2025
2
Last Updated
Jun 18, 2025
3
Submission Deadline
May 14, 2025, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Provide all labor, materials, and equipment necessary to repair four restrooms in Building 95 to provide a reliable and efficient plumbing system for 18th Contracting Squadron (18 CONS) Office. Architectural repairs include replacement of interior finishes including ceiling, wall and flooring, replacement of doors, windows, bathroom vanities, specialties such as partitions, and bathroom and janitorial accessories. Reconfigure the existing interior spaces on the first floor to provide minimum clearances, turning spaces, fixture spacing, and stall dimensions to accommodate personnel in wheelchairs. Mechanical repairs include replacement of bathroom exhaust fans and controls, replacement of plumbing fixtures, water heater, entire domestic water runs from fixtures to mains, domestic water risers, vent piping, and sanitary sewer piping from fixtures to mains. Electrical repairs include replacement of lighting fixtures, lighting controls, receptacles, and miscellaneous power for mechanical equipment. Provide temporary bathroom facility and utility connections required for construction. Suspect hazardous materials (hazmat) such as Asbestos Containing Material (ACM) and Lead-Based Paint (LBP) were tested in the work areas. Project includes abatement on positive building materials that will be disturbed by the repairs of the project. B) The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials.

People

Points of Contact

Gary WynderSECONDARY

Files

Files

View
View
View
View

Versions

Version 5
Solicitation
Posted: Jun 18, 2025
View
Version 4
Solicitation
Posted: May 7, 2025
View
Version 3
Solicitation
Posted: May 7, 2025
View
Version 2
Solicitation
Posted: May 7, 2025
View
Version 1Viewing
Solicitation
Posted: Apr 14, 2025