M--Boardwalk Replacement @ CUVA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting bids for the Boardwalk Replacement project at Cuyahoga Valley National Park (CUVA). This project involves the demolition of existing structures and the new construction of a boardwalk along the Ohio & Erie Canal Towpath Trail. This is a Total Small Business Set-Aside. Bids are due by May 27, 2026, at 12:00 PM ET.
Scope of Work
The project requires providing all labor, materials, tools, and equipment for the removal of a structurally failing boardwalk and partial foundation, followed by the installation of helical piles, timber decking, and framing. Key aspects include:
- Demolition: Existing boardwalk, timber piles, and asphalt pavement.
- New Construction: Installation of a new wood walking surface, helical piles, and a new rest area deck.
- Environmental Considerations: Work is within a Cultural Landscape, high-quality wetland, and floodplain, requiring careful management of vehicles and equipment. Trail rehabilitation and natural landscape restoration are required.
- Tree Planting: Contractor must provide and plant 60 trees (20 of each of 3 specified species), 1-inch caliper, within disturbance limits.
- Boardwalk Materials: 10-inch round timber pieces for elevation, and APVA21 angle connectors must be hot-dip galvanized or have a standard corrosion-resistant coating (e.g., ZMAX), not stainless steel.
- Quality Control: Significant changes shift responsibility for aggregates testing, compaction, moisture testing, and asphalt mix testing to the Contractor.
Contract Details
- Type: Firm-Fixed Price Contract
- Magnitude: Estimated between $1M and $3M.
- Period of Performance: 270 calendar days after Notice to Proceed (extended from 180 days).
- NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45M size standard.
- Set-Aside: Total Small Business (FAR 19.5).
- Subcontracting: Bidders should be aware of reporting requirements for "Limitations on Subcontracting" for this set-aside.
- Wage Rates: Subject to Davis-Bacon Act; prevailing wage rates for Summit County, Ohio, apply.
Submission & Evaluation
- Bid Submission: Electronically via email to craig_bryant@ios.doi.gov.
- Bid Opening: Virtual, May 27, 2026, at 12:00 PM ET.
- Requirements:
- Complete SF Form 1442.
- Acknowledge all amendments (SF30 or on SF1442).
- Submit a Bid Guarantee (20% of bid price, not to exceed $3M).
- Offerors must be registered in SAM.
- Pricing must be provided for all line items in the Bid Schedule, including Base Bid and Option 1 (3x Rough Sawn SIS Treated Lumber Decking).
- Site Visit: An initial site visit was held on April 15, 2026. Bidders are urged to inspect the site.
Key Dates & Contact
- Response Due: May 27, 2026, 12:00 PM ET.
- Anticipated Onsite Work Start: May/June 2026.
- Primary Contact: Craig Bryant (craig_bryant@ios.doi.gov, 440-717-3706).