M500 Water Main Replacement, Maxwell AFB

SOL #: PNQS260340Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3300 42 CONS CC
MAXWELL AFB, AL, 36112-6334, United States

Place of Performance

Montgomery, AL

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Pipe, Tube And Rigid Tubing (4710)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Mar 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the M500 Water Main Replacement project at Maxwell Air Force Base, Montgomery, AL. This project involves replacing an approximately 100-foot section of 12-inch water main pipe outside Building 500. This is a Total Small Business Set-Aside, and contractors must be located within a 250-mile radius of Maxwell AFB. The estimated magnitude of construction is between $200,000 and $250,000. Proposals are due March 16, 2026, at 1:00 PM local time.

Scope of Work

The contractor shall furnish all labor, materials, and equipment to perform the water main replacement. Key tasks include:

  • Excavating and removing the existing carbon-based water main pipe to depths of 4 to 7.5 feet.
  • Replacing the section with a new 100-foot water pipe meeting ANSI/AWWA C900 or equivalent standards.
  • Restoring all disturbed areas, including turf, tile, and concrete cart paths/sidewalks.
  • Maintaining a clear, hazard-free, and secured workplace with daily cleanup.
  • Furnishing manufacturer warranties for all incorporated components.
  • Complying with state, federal codes, OSHA, and specific Maxwell AFB instructions (e.g., fire regulations, environmental protection).
  • Adhering to security requirements, including employee lists, passes, and traffic regulations.

Contract Details

  • Contract Type: Firm Fixed Price
  • Magnitude: $200,000 - $250,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 (Water, Sewer, Pipeline, and Communications and Power Line Construction)
  • Size Standard: $45.00 million in annual receipts
  • Place of Performance: Maxwell AFB, Montgomery, AL 36112
  • Period of Performance: 150 calendar days to complete work, beginning within 10 calendar days after Notice to Proceed. Work will be performed during normal working hours (6:00 AM - 5:00 PM, Monday-Friday).
  • Wage Determination: Davis Bacon Act WD#: AL260093 applies.

Submission & Evaluation

  • Proposals Due: March 16, 2026, 1:00 PM local time.
  • Submission Method: Via email to the Contracting Officer and alternate POC.
  • Required Submittals: Offerors must complete AF Form 3052 (Construction Cost Estimate Breakdown) as part of their proposal. A detailed Submittal Register (Attachment 3) outlines various required documentation throughout the project lifecycle.
  • Evaluation: Award will be based on negotiation of a fair and reasonable price, using price analysis techniques and a determination of offeror responsibility. Offers providing less than 90 calendar days for Government acceptance will be rejected.
  • Eligibility: Offerors must be registered and active in the DoD System for Award Management (SAM) database and located within a 250-mile radius of Maxwell AFB.

Important Notes

  • An organized site visit is scheduled for March 5, 2026, at 9:00 AM CST. Participants will meet at the Air Force Culture and Language Center, Bldg 500.
  • Contractors are responsible for site investigation and obtaining an approved Construction Permit (AF Form 103) prior to excavation.

People

Points of Contact

Alec GreenSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 2, 2026
Version 1
Sources Sought
Posted: Feb 11, 2026
View
M500 Water Main Replacement, Maxwell AFB | GovScope