M500 Water Main Replacement, Maxwell AFB

SOL #: PNQS2603400002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3300 42 CONS CC
MAXWELL AFB, AL, 36112-6334, United States

Place of Performance

Montgomery, AL

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 11, 2026
2
Submission Deadline
Mar 20, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 42 CONS CC, is soliciting proposals for the M500 Water Main Replacement project at Maxwell Air Force Base, Montgomery, AL. This project involves replacing an approximately 100-foot section of 12-inch water main pipe outside Building 500. This is a Total Small Business Set-Aside opportunity.

Scope of Work

The contractor will furnish all labor, materials, and equipment to:

  • Excavate and remove the existing carbon-based water main pipe.
  • Replace the removed section with a new ANSI/AWWA C900 or equivalent water pipe.
  • Ensure proper pipe grading and restore all disturbed areas (turf, paths) to original condition.
  • Maintain a safe, hazard-free workplace and clean the site daily.
  • The project has a completion time of 150 calendar days, performed in one phase during normal working hours (6:00 AM - 5:00 PM).

Contract Details

  • Opportunity Type: Solicitation
  • Magnitude of Construction: Between $200,000 and $250,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5). Contractors must be located within a 250-mile radius of Maxwell AFB.
  • Evaluation: Proposals will be evaluated using Lowest Price Technically Acceptable (LPTA) or Trade-off, as determined by the Contracting Officer.
  • Wage Rate: Davis Bacon Act WD#: AL260093 (Montgomery County, AL building construction wage rates apply).
  • Bonding Requirements: Bid Guarantee (Bid Bond), Performance Bond, and Payment Bond are required with the proposal.

Key Clarifications & Requirements

  • The existing pipe is 12" and ranges from 4' to 7.5' deep. Bidders should use 100ft as the length for replacement in their bid.
  • Utility locates will be provided by 42CES/CEO after notice to proceed.
  • A 3" asphalt overlay is required, and sand & gravel backfill must be compacted to 95%.
  • Pressure testing requires a hydronic standing pressure test at 90 PSI or 150% of Working Pressure.
  • Contractor must comply with all applicable state, federal codes, OSHA standards, environmental protection, fire regulations, and health standards.
  • An approved Construction Permit (AF Form 103) is required prior to excavation.
  • As-Built drawings, traffic control, and required insurance (Workmen's Compensation, General Liability, Automobile Liability) are mandatory.

Submission Details

  • Response Due: March 20, 2026, by 5:00 PM Z (12:00 PM CT).
  • Submission: Proposals must be submitted via email to the primary and alternate POCs.
  • Amendment 0002: Issued March 13, 2026, adding Questions & Answers and updating Attachment 3 (Construction Cost Breakdown). Offerors must acknowledge receipt of this amendment.
  • Primary Contact: Lauryn Setzer (lauryn.setzer@us.af.mil, 334-953-6550)
  • Alternate Contact: Sean Johnson (sean.johnson.54@us.af.mil, 334-953-2599)

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 11, 2026
M500 Water Main Replacement, Maxwell AFB | GovScope