M739A1 Point Detonating/Delay (PD/DLY) Fuze

SOL #: W15QKN25R0002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-PICA
PICATINNY ARSENAL, NJ, 07806-5000, United States

Place of Performance

Place of performance not available

NAICS

Ammunition (except Small Arms) Manufacturing (332993)

PSC

Fuzes And Primers (1390)

Set Aside

No set aside specified

Timeline

1
Posted
May 15, 2025
2
Last Updated
Jul 17, 2025
3
Submission Deadline
Jul 29, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The M739A1 PD/DLY Fuze is the primary fuze for 105mm and 155mm bursting artillery projectiles for point detonating or delay fuze functions. SOCOM utilizes the M739A1 PD/DLY Fuze for training operations only. The US Army and USMC utilize the M739A1 PD/DLY Fuze for both training and tactical operations. The M739A1 PD/DLY Fuze is composed of a one-piece solid aluminum body with a standard 2-inch threaded base. Five modular subassemblies are incorporated as the functional fuze components. The M739A1 PD/DLY Fuze contains an Impact Delay Module (IDM) assembly that provides fuze initiation delay based upon the completion of mechanical actions caused by projectile deceleration. In the delay mode, the fuze will function 3-6 milliseconds after passing through the target. Function occurs when a spring-loaded firing pin is released. There are no explosive components contained within the IDM. The outer surface of the M739A1 PD/DLY Fuze is anodized green to distinguish it from other fuzes in the inventory for Explosive Ordnance Disposal (EOD) purposes.Solicitation Released on 15 May 2025 with Response Date 14 July 2025.Amendment 0001 released on 11 July 2025 with Response Date 29 July 2025.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 8
Solicitation
Posted: Jul 17, 2025
View
Version 7
Solicitation
Posted: Jul 14, 2025
View
Version 6Viewing
Solicitation
Posted: Jul 11, 2025
Version 5
Solicitation
Posted: Jun 3, 2025
View
Version 4
Solicitation
Posted: Jun 3, 2025
View
Version 3
Solicitation
Posted: May 28, 2025
View
Version 2
Solicitation
Posted: May 23, 2025
View
Version 1
Solicitation
Posted: May 15, 2025
View