MACA-REPAIR OF PEDESTRIAN BRIDGE FOUNDAT

SOL #: 140P5326Q0017Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 31, 2026
2
Submission Deadline
Apr 14, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), through its SER NORTH MABO office, is soliciting proposals for the Cosmetic Repair of a Pedestrian Bridge Foundation at Mammoth Cave National Park, Kentucky. This is a Total Small Business Set-Aside opportunity. The work involves concrete repair, substructure reinforcement, and veneer installation. Proposals are due April 14, 2026, by 3:00 PM CST.

Scope of Work

This project focuses on the cosmetic repair of the pedestrian bridge foundation, as detailed in Attachment 1 (MACA_337611A_SOW). Key tasks include:

  • Surface Crack and Spall Repair: Inspection, preparation, and repair of approximately 663 square feet of cracks and spalls on the hotel and visitor center sides. This involves epoxy injection for small cracks and chipping/non-shrink mortar for larger ones.
  • Beneath-Bridge Substructure Repairs: Mechanical scarification, formwork installation, and placement of high-strength concrete with vibration for consolidation.
  • Sandstone Veneer Installation: Application of matching sandstone veneer (150-200 SF) on the hotel side and alternating retaining wall blocks (100-150 SF) on the visitor center side, ensuring materials match existing aesthetics. All work must comply with applicable ACI, ASTM, OSHA, SMACNA, and NPS historical preservation standards.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: 165 calendar days from the Notice to Proceed.
  • Place of Performance: Mammoth Cave National Park, Kentucky.
  • Submission Deadline: April 14, 2026, by 3:00 PM CST.
  • Submission Method: Via email to arcoiris_cuetara-higa@ios.doi.gov.
  • Published Date: March 31, 2026.

Evaluation & Submission Requirements

Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Technical acceptability is a PASS/FAIL determination, followed by price evaluation for technically acceptable offers. Mandatory Technical Acceptability Criteria (per Attachment 5):

  • Submission of Quoter Information.
  • Demonstration of two relevant projects completed within the last five years, showcasing specific concrete repair and masonry/veneer installation experience on bridges or similar structures.
  • Identification of key subcontractors, if applicable.
  • Completion of a SOW/Specifications Compliance Checklist.
  • Provision of a proposed schedule demonstrating completion within 165 calendar days.
  • Quoter Certification acknowledging mandatory project requirements. Failure to complete any required entry in Attachment 5 will result in a "FAIL" rating. Offerors must also submit a signed SF 1442 and acknowledge all amendments. Performance and Payment Bonds are required within 15 calendar days of award.

Important Notes

  • A mandatory site visit is scheduled for March 27, 2026, at 10:00 AM CST at Mammoth Cave National Park, Kentucky. All bidders are required to attend.
  • Continuous pedestrian access (minimum 48-inch clear width, ABA/ADA compliant) must be maintained throughout the project.
  • Full overhead protection measures are required to prevent debris from falling onto underlying infrastructure.
  • Bidders must consult Attachment 2 (Wage Rate KY20260040) for prevailing wage rates.
  • Offers must remain valid for 150 days after the due date.

People

Points of Contact

Cuetara-Higa, ArcoirisPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
MACA-REPAIR OF PEDESTRIAN BRIDGE FOUNDAT | GovScope