Maintenance Dredging Coast Guard Station Cape Disappointment – Ilwaco - WA - FY 2026

SOL #: 70Z08826R0000384Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
CEU OAKLAND(00088)
OAKLAND, CA, 94612, United States

Place of Performance

Ilwaco, WA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Dredging Facilities (Z1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 27, 2025
2
Last Updated
Dec 4, 2025
3
Submission Deadline
Dec 1, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Invitation For Bid (IFB) No: 70Z08826B0000384, FY26 MAINTENANCE DREDGING AT STATION CAPE DISAPPOINTMENT, ILWACO, WA

Z1KF - MAINTENANCE OF DREDGING FACILITIES

237990 - Other Heavy and Civil Engineering Construction

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

Project Description:

Major work items include: Conducting maintenance dredging; providing hydrographic and EEL surveys before and after dredging; disposing of dredge spoils at approved beneficial reuse site(s); providing the USCG with access to real-time and near real time internet monitoring of dredging operations and production; complying with the terms and conditions off all environmental permits and approvals; and the provision of a Pre & Post Dredge Project Reports. All work done in accordance with attached Specifications as Appendix C.

Work Window: The approved in-water work window for this project closes February 15, 2026. All dredging work must be completed by February 15, 2026.

The procurement estimate is between $1,000,000.00 and $5,000,000.00. The NAICS for this project is 237990.

This requirement is issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) Contract.

Please carefully review all attachments. Request for Clarification can be submitted to BOTH Vincent Yee at vincent.yee@uscg.mil AND Guiljohn Alcantara at guiljohn.alcantara@uscg.mil  Request for Clarification should be submitted using form provided, Appendix F.

Submitted BIDs must include the following information-

  1. One (1) completed copy of the SF 1442 (Appendix A) and signed copies of all amendments.
  2. Appendix A1-Bid Breakdown Sheet.
  3. IFB-Section B, schedule of Prices
  4. IFB- Section K, Reps and Certs (note IFB highlighted sections)
  5. IFB- Section L, Bid Bond (Standard Form 24)
  6. IFB- Section K.8 (if applicable)- Certification of Authority to Bind Corporation.

Bids shall be up-loaded via DOD Safe from November 17, 2025 thru Mon, December 1, 2025, at 1:00 p.m., Pacific Time (PST)

Due to the Thanksgiving Holidays, no upload links will be provided Nov. 27-28.  Early Bid submittals are highly encouraged.

Please do not call to inquire about the status of your bid, as this information will not be released.

People

Points of Contact

Guiljohn A. AlcantaraSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Dec 4, 2025
View
Version 4
Solicitation
Posted: Nov 21, 2025
View
Version 3
Solicitation
Posted: Oct 29, 2025
View
Version 2Viewing
Solicitation
Posted: Oct 27, 2025
Version 1
Solicitation
Posted: Oct 27, 2025
View
Maintenance Dredging Coast Guard Station Cape Disappointment – Ilwaco - WA - FY 2026 | GovScope