Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project

SOL #: W912DS26BA015Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW YORK
NEW YORK, NY, 10278-0004, United States

Place of Performance

Gilgo Beach, NY

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Dredging Facilities (Y1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
Apr 27, 2026
3
Response Deadline
May 12, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), New York District, is issuing a presolicitation for Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project. This project involves maintenance dredging and beach nourishment, with an estimated cost between $25,000,000 and $100,000,000. This is an Unrestricted Procurement.

Scope of Work

The project entails maintenance dredging of the Fire Island Inlet Federal Navigation channel and deposition basin, followed by the placement of up to 2,500,000 cubic yards of dredged sand as nourishment along the designated feeder beach at Gilgo Beach, Suffolk County, New York. Dredging will be to a depth of up to 14 feet plus 2 feet allowable over-depth.

This multi-purpose project aims to:

  • Alleviate shoaling and maintain authorized navigation channel dimensions for commercial and recreational boating.
  • Provide coastal storm risk management by renourishing Gilgo Beach.
  • Restore normal littoral movement to replenish western beaches and protect Ocean Parkway.

The work requires a large pipeline dredge meeting US Coast Guard criteria for an "ocean going vessel." The contractor must commence work within five calendar days of the Notice to Proceed (NTP) and complete basic work within 180 calendar days. A minimum placement production rate of 14,500 cubic yards per calendar day is required. Liquidated damages of $2,770.00 per calendar day will apply for delays.

Contract & Timeline

  • Type: Presolicitation (leading to a construction contract)
  • Estimated Value: $25,000,000 - $100,000,000
  • Set-Aside: Unrestricted Procurement
  • Plans & Specs Available: June 2026
  • Bid Opening: July 2026
  • Anticipated Award: August 2026
  • Anticipated NTP: Late September 2026
  • Response Date (for presolicitation comments/questions): May 12, 2026
  • Published: April 27, 2026

Additional Notes

This notice is for planning purposes. The full solicitation, including plans and specifications, will be made available in June 2026. Interested parties should monitor SAM.gov for the official solicitation release. Contact Nicole C. Fauntleroy at nicole.fauntleroy@usace.army.mil or 917-790-6139 for inquiries.

People

Points of Contact

Nicole C. FauntleroyPRIMARY
Nicholas P. EmanuelSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2Viewing
Pre-Solicitation
Posted: Apr 27, 2026
Version 1
Pre-Solicitation
Posted: Apr 13, 2026
View
Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project | GovScope