Malheur National Forest, OR Falls Fire Road Repair

SOL #: 12363N26Q4057Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Washington, DC, 202501138, United States

Place of Performance

John Day, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
Feb 27, 2026
3
Submission Deadline
Mar 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a Combined Synopsis/Solicitation for Malheur National Forest, OR Falls Fire Road Repair. This is a Total Small Business Set-Aside BPA Call Order, exclusively for current Region 6 Roads BPA holders. The project involves commercial construction for road repairs to mitigate damage from the Falls Fire. Amendment 0001 was published on February 27, 2026, providing key clarifications. Quotes are due March 5, 2026, at 11:00 am Pacific Time.

Scope of Work

This project focuses on repairs to National Forest Service Road 3100-000 and includes two main components:

  • Base Item (31 Road Asphalt Reclamation): Pulverizing approximately 12.7 miles of existing paved road surface to a depth of no more than 2 inches, shaping, and compacting it. This includes traffic control and is estimated to take four weeks.
  • Option 1 Item (31 Road Repairs at Stancliffe Bridge Approaches): Excavating and repairing road approaches to the Stancliffe Bridge, involving gabion baskets, road base, subbase, and new asphalt. This is estimated to take two weeks.

Key Requirements & Clarifications

  • Road Width: Typically 24 feet, with variations.
  • Pulverization: Must use a pulverizing machine; equipment tracks are insufficient. All pieces must be less than 2 inches. Pulverization can extend deeper than pavement if subbase allows.
  • Gabion Baskets: Baffles on 6-foot baskets do not need to aesthetically match 4-foot baskets (2' spacing for 4' baskets, 3' for 6' baskets is acceptable). Alternative configurations can be proposed.
  • Specifications: Adherence to FHWA Standard Specification 2014 and extensive Forest Service Supplemental Specifications (FSSS) is required. FSSS significantly amends and replaces numerous sections of FP-14, impacting definitions, scope, construction methods, materials, and acceptance criteria.
  • Environmental: Strict aquatic conservation measures are in place, including fish passage, pollution/erosion control, and site restoration (70% revegetation within three years). Fire protection and suppression requirements are also mandatory.
  • Labor: Davis-Bacon Act prevailing wage rates (OR20260001) apply for highway construction projects.

Contract Details

  • Contract Type: BPA Call Order (Combined Synopsis/Solicitation)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Value: $100,000 - $250,000
  • Period of Performance: Overall completion by August 14, 2026, with Notice to Proceed anticipated around July 1, 2026.
  • Place of Performance: John Day, OR (Malheur National Forest).

Submission & Evaluation

  • Quote Submission: Bidders must complete the "Quote" section of the BPA Call Form, provide pricing in Section B, and answer the BPA Call Questionnaire. A Bid Guarantee is required for quotes exceeding $150,000.
  • Evaluation Criteria: Best overall value, considering non-price factors (Contractor's Capability based on Questionnaire) and Price. Price importance increases as technical scoring differences decrease.

Important Dates

  • Published Date: February 27, 2026
  • Quote Response Date: March 5, 2026, 11:00 am Pacific Time

Contact Information

People

Points of Contact

cynthia horwitzPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Malheur National Forest, OR Falls Fire Road Repair | GovScope