Manufacturing of AUMA Actuators for Allegheny River Lock and Dam 4
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers (USACE), Pittsburgh District, intends to award a sole source purchase order to AUMA Actuators, Inc. for the manufacturing of sixteen (16) AUMA actuators for the Allegheny River Lock and Dam Four (4). This notice serves as a Sources Sought for market research, and interested parties may submit capability statements.
Scope of Work
The requirement is to replace all sixteen (16) existing AUMA actuators currently used for operating the filling and emptying valves in the single chamber at Lock and Dam No. 4 on the Allegheny River. The specific units required are AUMA SAR10.2/AC01.2 multi-turn electric actuators with remote mount actuator control units. These new units must be functional equivalents to the original AUMA SA10.1-108 previously supplied to the project.
Contract & Timeline
- Type: Sources Sought (with intent for Sole Source Purchase Order)
- Agency: Department of the Army, USACE Pittsburgh District
- Product Service Code: 4810 (Valves, Powered)
- Set-Aside: None (Sole Source)
- Capability Statement Due: April 27, 2026
- Published: April 30, 2026
Submission Requirements
Interested parties capable of fulfilling this requirement should submit a capability statement no later than April 27, 2026. Responses must include:
- Company name
- UEI number
- CAGE code
- Point of contact information
- A detailed capability statement addressing the requirement
Additional Notes
This notice is not a request for competitive quotes. The government's determination not to compete this proposed contract action, based on responses to this notice, is solely within its discretion. A full Justification and Approval has been prepared in accordance with agency procedures and will be available upon request.