Material for Hardware Fabrication

SOL #: 80NSSC26930727QCombined Synopsis/Solicitation

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA SHARED SERVICES CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Place of performance not available

NAICS

All Other Miscellaneous Fabricated Metal Product Manufacturing (332999)

PSC

Plate, Sheet, Strip, Foil, And Wire: Precious Metal (9545)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 21, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics and Space Administration (NASA), through the NASA Shared Services Center, is soliciting quotes for Material for Hardware Fabrication. This Small Business Set-Aside opportunity requires the procurement of 27 sheets of 3/8" Thick x 4'x8' 6061-T651 aluminum material, which must be Domestic/DFARS Compliant. The material is for fabricating parts for the 9x15 building at NASA Glenn Research Center. Quotes are due by April 21, 2026, at 12 p.m. CT.

Scope of Work

The requirement is for 27 sheets of 3/8" Thick x 4'x8' 6061-T651 aluminum material. All material must be Domestic/DFARS Compliant. Mill Test Reports and Certificates of Conformance are mandatory for all materials and any special processes, and must be delivered with the material. Specific machining tolerances and edge requirements for the aluminum sheets, such as "shear cut +/- 0.063" or "CNC plate saw cut +/- 0.125", must be considered when quoting. Non-conforming materials will be returned at the vendor's expense.

Contract & Timeline

  • Contract Type: Firm Fixed Priced (TBD)
  • Period of Performance: Material delivery is expected within 2-5 days after order receipt.
  • Set-Aside: Small Business
  • Quote Due Date: April 21, 2026, by 12 p.m. CT
  • Questions Deadline: April 17, 2026, by 12 p.m. CT (email only)
  • Quote Validity: Quotes shall remain valid for 30 days, though NASA may accept varying validity periods (10, 20, or 30 days) depending on award speed.
  • Delivery: FOB Destination to NASA Glenn Research Center, 21000 Brookpark Rd, Building 50 Room 130, Cleveland, OH 44135.

Submission & Evaluation

Quotes must be submitted via email to SARA.A.JUSINO-TERRY@NASA.GOV. Submissions must include two points of contact (name, phone number, email address). The award will be made to the responsible Offeror whose offer is the Lowest Price Technically Acceptable (LPTA). Offers not deemed technically acceptable will be removed from consideration. Offerors must be registered at www.sam.gov.

Key Clarifications

  • Delivery Procedures: Drivers delivering to NASA Glenn Research Center must provide their full legal name, email, and approximate arrival time. Drivers must be US citizens with a REAL ID and no weapons. NASA will arrange an escort and temporary pass.
  • Material Unloading: NASA will use its forklift to unload materials from the delivery truck; the driver does not need to provide unloading equipment.
  • Accelerated Payments: Small businesses can request an "accelerated net-15 payment schedule upon delivery" directly within their quote; no additional form is required.

Contact

Sara Jusino-Terry at sara.a.jusino-terry@nasa.gov.

People

Points of Contact

Sara Jusino-TerryPRIMARY

Files

Files

Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Material for Hardware Fabrication | GovScope