MATOC WORK PLAN EXPANSION OF DOORSTOP PARKING APRON ON OSAN AB

SOL #: W90VN626RA002Combined Synopsis/Solicitation

Overview

Buyer

APO, AP, 96202-0000, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Airfield Structures (Z2BZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Feb 5, 2026
3
Submission Deadline
Jan 16, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Amendment 0003 to the MATOC Work Plan for the Expansion of the Doorstop Parking Apron on Osan AB has been issued by the Department of the Army. This amendment revises technical documents, adds subcontracting requirements, and extends the proposal closing date to February 23, 2026, at 1000 Hrs (KST). This opportunity is exclusively for specific eligible awardees under the MATOC for LCS Projects.

Scope of Work

This project involves the expansion of the Doorstop Parking Apron at Osan Air Base. The Statement of Work and drawings have been replaced with a version dated January 21, 2026, as part of this amendment.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (MATOC Work Plan)
  • Contract Vehicle: Task Order pursuant to FAR Subpart 16.505 (Fair Opportunity Procedures)
  • Eligible Contractors: W91QVN-24-D-0059, -0062, -0063, -0064, -0067, -0069, -0070, -0073, -0076, -0078, -0084, -0085.
  • Estimated Price Range: $1,000,000 to $5,000,000.
  • Set-Aside: None specified.
  • Product Service Code: Z2BZ (Repair Or Alteration Of Other Airfield Structures).

Amendment 0003 Key Changes

  • Revised Documents: The Statement of Work and drawings are replaced with the version dated January 21, 2026.
  • Subcontracting Requirement: If subcontracting exceeds 50%, offerors must obtain prior written approval from the PCO or ACO and include subcontractor details (names, addresses, type, estimated price) in their technical proposal.
  • Proposal Due Date Extension: The closing date is extended from February 13, 2026, to February 23, 2026, at 1000 Hrs (KST).

Key Dates & Actions

  • Site Visit: December 30, 2025, at 0930 hours, meeting at the main entrance of Building 600, Osan AB. Attendance is strongly encouraged.
  • Questions Due: Within three (3) days after the issuance of Amendment 0003.
  • Proposal Submission: By 1000 Hrs (KST) on the closing date. Refer to Section L for details.
  • No Offer Letter: Contractors unable to submit a proposal must submit a 'no offer' letter by the specified date and time.

Evaluation

The Government anticipates making an award based on initial proposals without conducting exchanges. Offerors' initial task order proposals should contain their best terms. The Government reserves the right to conduct exchanges if deemed in its best interest.

Contact Information

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 13, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Dec 17, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Dec 16, 2025
View
MATOC WORK PLAN EXPANSION OF DOORSTOP PARKING APRON ON OSAN AB | GovScope